Loading…
Loading…
21,040 results • Best match
at Munduparamba-ChennathMelmuri-Maryad Ist reach-In between km 1/000 to km 2/000 in Malappuram LAC, Malappuram dist-General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Construction of New Boundary Wall at Govt Hospital No. 3 Maheswari Bhawan District Bikaner
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar.
Estimate for Remodeling/Rehabilitation for lining of W/C At Outlet RD 10415-L Khank Minor
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
Pro No.415/24, LPGP 2024-25 Maintenance of Perur PHC (MGNR Fund - Rs.184986/-)-Pro No. 415/24-25
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
Construction of Pope Nagar Canal bridge at chainage 5/000 km of Ollukara branch canal
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
GENERAL Budget work KIP Canal Roads LBMC maintenance of Canal Roads between ch 13610m to 20000m General Civil Work
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
Different maintenance work at industrial area Parbatpura, Makhupura and PPMP Exrn, amounting to Rs. 11.85 lakh
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Annual Plan-Cheacode GP 2025 26 Project No 410 26 Parappurathuparamp School Classroom Construction Ward 03 General Civil Work
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
GENERAL-Sheet laying above the verandah of Chemistry Block - at Brennen College,Thalassery-General Civil Work
15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
618/26)-BUDS SCHOOL ENTRANCE AND NAME BOARD INSTALLATION
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar