Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | ₹2.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 LRejected-Finance | ₹2.3 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Saji Jose L1 | RAJU P J L2 |
|---|---|---|---|---|---|
| 1.00Buds School | |||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.85 | cum | 1,841 ₹1,559.33 | 1,919 ₹1,625.39 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.39 | cum | 311 ₹121.91 | 324 ₹127.01 |
| 1.00 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 2.07 | cum | 853 ₹1,765.71 | 889 ₹1,840.23 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.07 | cum | 6,857 ₹14,193.99 | 7,148 ₹14,796.36 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.07 | cum | 7,983 ₹16,524.81 | 8,322 ₹17,226.54 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 8 | sqm | 872 ₹6,976 | 908 ₹7,264 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.39 | cum | 11,039 ₹15,366.29 | 11,508 ₹16,019.14 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 111.36 | kilogram | 97 ₹10,801.92 | 101 ₹11,247.36 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 462.31 | kg | 154 ₹71,196.51 | 160 ₹73,970.4 |
Tender Value
₹2.4 L
EMD Value
₹5,932
Closing Date
13 Mar 2026, 3:00 pmClosed
LID AND EW SECTION KODANCHERY
ASSISTANT ENGINEER OFFICE LID AND EW SECTION KODANCHERY
618/26)-BUDS SCHOOL ENTRANCE AND NAME BOARD INSTALLATION
2026_LSGD_844378_1
AE/LIDEW/ETENDER/KRY/122/25-26
Open Tender
Civil Works - Others
180 days
MAIKAV
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,932
Yes
18 Jun 2026
6 Mar 2026
14 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
Buds School
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD513027/2025-2026:Providing and fixing metal name board of size 120x60 cm with MS sheet 0.8mm thick, 15mm dia and 2mm thick GI pipe, 35x35x5mm angle for post etc. erected in concrete of CC 1:2:4
OD513075/2025-2026:Supplying and fixing stainless steel metal name letters of 15 cm to 25 cm size range (24 gauge ) including all charges etc complete
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
PA.pdf
Additional Documents • 0.26 MB
AFFIDAVIT.pdf
Tender Documents • 0.24 MB
EPAY.pdf
Other Document • 0.23 MB
BOQ_1425550.xls
BOQ • 0.31 MB
INTEGRITY.pdf
Additional Documents • 0.23 MB
TENDERFORM.pdf
Additional Documents • 0.25 MB
SBD.pdf
Additional Documents • 1.66 MB
Download all tender documents and submit your bid