Loading…
Loading…
685 results • Best match
Flood Damage Repairs of Manavadar Checkdam(Phase-1, Job No.1/2) Near Village Manavadar, Ta. Manavadar, Dis Junagadh
machinery for mining, quarrying and Construction for the month
Repairing of checkdam Job No. 1757 At village Khimpadar In taluka Mendarada
machinery for mining, quarrying and Construction for the month
Repairing Work of New D.E.E. Chamber at Karjan, Ta. Karjan Di. Vadodara
machinery for mining, quarrying and Construction for the month
Construction of Block Level Stadium under DHARAKOTE Block With Indoor hall in the district of Ganjam_building
Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well).
Tourist Reception Centre for Integrated Development of Deomali in Koraput District
Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only
Building Work
10000556 Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200cfm/300psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories,tools and plant and consumables etc for lowering of 200mm dia PVC pipes for housing fitted with socket and with or without well screen as per tenecessity for soft,medium,hard and boulder formation (PVC casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and with drawing after completion of the tube well).(Icluding both LABOUR FOR DRILLING 200MM DIA UPTO 30 MTR. & LABOUR FOR DRILLING 150MM DIA FROM 30 MTR TO 150 MTR including all.) CONSIDER FOR 150 MTR DEPTH. Ground Floor