Loading…
Loading…
2,008 results • Best match
Installation and Energisation of KIKIRIBEDA-V L.I. Project under KHARIAR Block in NUAPADA District (RIDF-XXX 2025-26)
Cost of cuttng and filling of trench for overburden earth and ridges of plots over and above stabdard estimate of trenc for pipe line
Installation and Energisation of NILZEE-II L.I. Project under SINAPALI Block in NUAPADA District (RIDF-XXX 2025-26)
Cost of cuttng and filling of trench for overburden earth and ridges of plots over and above stabdard estimate of trenc for pipe line
Installation and Energisation of MUDHELA-II L.I. Project under NUAPADA Block in NUAPADA District (RIDF-XXX 2025-26)
Cost of cuttng and filling of trench for overburden earth and ridges of plots over and above stabdard estimate of trenc for pipe line
Installation and Energisation of GODAL-III L.I. Project under SINAPALI Block in NUAPADA District (RIDF-XXX 2025-26)
Cost of cuttng and filling of trench for overburden earth and ridges of plots over and above stabdard estimate of trenc for pipe line
Installation and Energisation of MALPADA-I L.I. Project under SINAPALI Block in NUAPADA District (RIDF-XXX 2025-26)
Cost of cuttng and filling of trench for overburden earth and ridges of plots over and above stabdard estimate of trenc for pipe line
Construction of Rooptop Water Harvesting Structure with Recharge Shaft and Talab Renovation PS Kumher Under MJSA 2-2
Construction of Tube Well from ground level and up to 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. Nominal bore 250 mm dia.