Loading…
Loading…
2,008 results • Best match
Providing 150mm dia Bore Well With Mini Power Pump, Construction of HDPE Tank and Extention of Pipe Line at Ward No. 14 Kallampalayam and Ward No. 11 Olapalayam Motor Room Near PWD Bridge to OHT in Arasiramani Town Panchayat
Drilling of 150mm dia. bore wells in overburden soil including labour charges for insertion of casing pipes
Installation and Energisation of LIAD-II L.I. Project under SINAPALI Block in NUAPADA District (RIDF-XXX 2025-26)
Cost of cuttng and filling of trench for overburden earth and ridges of plots over and above stabdard estimate of trenc for pipe line
Installation and Energisation of BARANDAPAT-I L.I. Project under KOMANA Block in NUAPADA District (RIDF-XXX 2025-26)
Cost of cuttng and filling of trench for overburden earth and ridges of plots over and above stabdard estimate of trenc for pipe line
Installation and Energisation of BHAISATAL-I L.I. Project under NUAPADA Block in NUAPADA District (RIDF-XXX 2025-26)
Cost of cuttng and filling of trench for overburden earth and ridges of plots over and above stabdard estimate of trenc for pipe line
Installation and Energisation of JOGIBAHAL-III L.I. Project under SINAPALI Block in NUAPADA District (RIDF-XXX 2025-26)
Cost of cuttng and filling of trench for overburden earth and ridges of plots over and above stabdard estimate of trenc for pipe line
Construction of Boundary wall and approach road in the premises of RW Section office at Jeerango Now R.W.Section Rayagada-II after restructuring for the year 2025-26
Earth work in removal of overburden in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge