Loading…
Loading…
2,014 results • Best match
Embankment protection
Quarrying,collecting,supplying and stacking of hard granite stone boulder of at least 30cm in length in any direction, 50kg. in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials dumping the stones in rip raps, spur and slope protection works including filling the interstices with small stones wedging and packing surface to proper line leveles including fixing wave breakers etc.including cost,conveyance,royalty taxes of all materials of approved quality with uniform colour and texture from approved quarry with all leads,lifts delifts including dumping in water hire charges of boats, lunch etc. and all other incidental charges with quality control test etc.complete asper specification and direction of the Engineer in Charge (Measurement to be taken in level section & 1/6th voids will be deducted from the finished levelsection and payment will be made to the quantity so arrived between the stack measurement and level section after deduction of 1/6th voids, which ever is less).
Embankment protection
Quarrying,collecting,supplying and stacking of hard granite stone boulder of at least 30cm in length in any direction, 50kg. in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials dumping the stones in rip raps, spur and slope protection works including filling the interstices with small stones wedging and packing surface to proper line leveles including fixing wave breakers etc.including cost,conveyance,royalty taxes of all materials of approved quality with uniform colour and texture from approved quarry with all leads,lifts delifts including dumping in water hire charges of boats, lunch etc. and all other incidental charges with quality control test etc.complete asper specification and direction of the Engineer in Charge (Measurement to be taken in level section & 1/6th voids will be deducted from the finished levelsection and payment will be made to the quantity so arrived between the stack measurement and level section after deduction of 1/6th voids, which ever is less).
Restoration of spur
Quarrying,collecting,supplying and stacking of hard granite stone boulder of at least 30cm in length in any direction, 50kg. in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials dumping the stones in rip raps, spur and slope protection works including filling the interstices with small stones wedging and packing surface to proper line leveles including fixing wave breakers etc.including cost,conveyance,royalty taxes of all materials of approved quality with uniform colour and texture from approved quarry with all leads,lifts delifts including dumping in water hire charges of boats, lunch etc. and all other incidental charges with quality control test etc.complete asper specification and direction of the Engineer in Charge (Measurement to be taken in level section & 1/6th voids will be deducted from the finished levelsection and payment will be made to the quantity so arrived between the stack measurement and level section after deduction of 1/6th voids, which ever is less).
Embankment protection
Quarrying,collecting,supplying and stacking of hard granite stone boulder of at least 30cm in length in any direction, 50kg. in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials dumping the stones in rip raps, spur and slope protection works including filling the interstices with small stones wedging and packing surface to proper line leveles including fixing wave breakers etc.including cost,conveyance,royalty taxes of all materials of approved quality with uniform colour and texture from approved quarry with all leads,lifts delifts including dumping in water hire charges of boats, lunch etc. and all other incidental charges with quality control test etc.complete asper specification and direction of the Engineer in Charge (Measurement to be taken in level section & 1/6th voids will be deducted from the finished levelsection and payment will be made to the quantity so arrived between the stack measurement and level section after deduction of 1/6th voids, which ever is less).
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Rough Stone Dry Packing including Quarrying, Collection & Supplying hard stone other than granite of size 15cm to 30 cm in length.in any direction, not less than 0.003 Cum in volume free from weather skin surface and other deleterious materials and packing in aprons, revetments, slope packing (as per Design and Drawing) including filling the interstices with small stones, wedging and hammering etc. including cost, conveyance, royalty, Labour Cess, taxes of all materials from approved quarry of approved quality of uniform color and texture with all leads, lifts, delift, handling and re-handling with cost of labour charges and other incidentals charges required to complete the work and quality control testing charges etc. complete as per specification and direction of the Engineer-in-Charge .
Embankment work
Quarrying, collecting, supplying and stacking of good quality of moorum and sand in regular box heap size of 1.50m X 1.50m X 0.50m to be measured as one cum and admixing moorum and sand in (70 : 30) proportion and laying in sub-base of road in layers not exceeding 150 mm thick with all leads, lifts and delifts including cost, conveyance, royalty, cess including hire charges of T&P materials required for the work, watering and consolidation with P.R.R., hire and running charges of machineries etc.complete as per specification and direction of the Engineer-in-Charge.