Loading…
Loading…
2,034 results • Best match
Restoration and Strengthening to FPE On Suktel right From RD 340m to 1200m near Village Bileisarda
Earth work in filling in ane approved type of soil from approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 5 km on properly prepared and scientifically approved surface including spreading and leveling the earth in 22.5 cm layers to make ready for watering earth work upto OMC condition and compaction by V.R.R. in embankment for all heights including construction, maintenace, watering lighting of haul road and borrow area and running charges of all machineries,cess etc. complete as per the direction of Engineerr - in-charge.
Construction of FPE On Keutijore nallah right from RD 230m to 1110 m near village Likhiria
Earth work in filling in ane approved type of soil from approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 5 km on properly prepared and scientifically approved surface including spreading and leveling the earth in 22.5 cm layers to make ready for watering earth work upto OMC condition and compaction by V.R.R. in embankment for all heights including construction, maintenace, watering lighting of haul road and borrow area and running charges of all machineries,cess etc. complete as per the direction of Engineerr - in-charge.
Construction of FPE On Suktel Left from RD 00m to 560m near village Chhelbahal of Loisingha Block
Earth work in filling in ane approved type of soil from approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 5 km on properly prepared and scientifically approved surface including spreading and leveling the earth in 22.5 cm layers to make ready for watering earth work upto OMC condition and compaction by V.R.R. in embankment for all heights including construction, maintenace, watering lighting of haul road and borrow area and running charges of all machineries,cess etc. complete as per the direction of Engineerr - in-charge.
Improvement to Dimiriguda-I Check Dam in Muniguda Block of Rayagada District under the scheme Improvement to Check Dam 2026-27
Cement concrete M15 grade with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer with all leads & lifts including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty,EMF, DMF, additional charge and other taxes of all materials supplying all labour and T&P required for the work etc. complete in all respect as directed by Engineer-in-charge.
Improvement to Kurumjodi Check Dam in Muniguda Block of Rayagada District under the scheme Improvement to Check Dam 2026-27
Cement concrete M15 grade with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer with all leads & lifts including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty,EMF, DMF, additional charge and other taxes of all materials supplying all labour and T&P required for the work etc. complete in all respect as directed by Engineer-in-charge.
Improvement to Bandhuguda Check Dam (RG010085) in Bissamcuttack Block of Rayagada District under the scheme Improvement to Check Dam 2026-27
Cement concrete M15 grade with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer with all leads & lifts including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty,EMF, DMF, additional charge and other taxes of all materials supplying all labour and T&P required for the work etc. complete in all respect as directed by Engineer-in-charge.