Loading…
Loading…
2,058 results • Best match
Construction of Treasury Strong Room of Collector and District Magistrate, Ganjam at Chhatarpur in the District of Ganjam for the year 2023-24
Sinking of 200mmx150mm dia large Tube well Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation(G.I/P.V.C/M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore. Drilling of 200mm dia bore 00 mtr to 45mtr
Construction of N.H.Sub-Division Office at Sambalpur in the District of Sambalpur for the year 2025-26
Construction of 1nos production wells including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessories. Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only Drilling of 200 mm dia bore a) 00 mtr to 30 mtr
Rate Contract for Construction and commissioning of Tube Wells various Rig Machine with Pipe Line Under Rural Sub Dn. II Barmer
Construction of Tube Well from ground level and upto 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. Nominal bore 200 mm dia.
Rate Contract for Construction and commissioning of Tube Wells various Rig Machine with Pipe Line Under Rural Sub Dn. I Barmer
Construction of Tube Well from ground level and upto 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. Nominal bore 200 mm dia.
Rate Contract for Construction and commissioning of Tube Wells various Rig Machine with Pipe Line Under City Sub Dn. Prod. Barmer
Construction of Tube Well from ground level and upto 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. Nominal bore 200 mm dia.
Dalbama PWSS under Guwahati Division No-I under SOPD-G for the year 2024-25
8.3.1. Drilling with drill bit in overburden portion of soil formation including collection of soil sample at every 3.0 m depth wherever there is a change of strata in sample boxes with distinguishing marks upto the depth of rock formation and withdrawing the drill bit for lowering casing as directed with 245mm to 300 mmm dia drill bit