Loading…
Loading…
1,371 results • Best match
Computer with Accessories, Visualizer, Projector with Screen, Networking, Switching, Control Equipment & Matrix Switcher, Podium with Integrated Control & Annotaion, Biometric System (Dual Factor), Mobile Jammer, CCTV System, Fire Alarm System, Online UPS (5 KVA)
Computer Printer AMC
Network Switch 5 Ports
Construction of 1 no 6.3 MVA PTR, 1no Cable End Box Support Structure, 1no VCB, 1no CT, 1no PT Foundation along with necessary Power and Control Cable Trench, Pathway and other allied Civil Works for Creation of Bay at Khudiramnagar 33/11 kV S-Stn.
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angles, channel sections) conforming to IS : 226, IS : 808 & SP (6) : 1964 connected to one another with bracket, gusset, cleats as per design, direction of Engineer-in-Charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS : 816 1956 & IS : 1995 using electrodes of approved make and brand conforming to IS : 814 – 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charges of all tools and plants and labour required for the work including all incidental charges such as electricity charges, labour insurance charges etc. i) For structural members of specified section weighing less than 22.5 Kg / M.
SOLAR AC, SOLAR PANEL, DC CABLES, PVC CONDUIT PIPE, STRING PROTECTION COMPONENTS, BUSBAR, DC MCB, DISTRIBUTION BOX, AC DC CHANGEOVER SWITCH, SS STRUCTURE, CIVIL WORK, EARTHING
AC DC CHANGEOVER SWITCH
Solar Panel 590WT with 25 year warranty, Solar Inverter Servotech 7584 8KVA with 5 year warranty, GI Structure, Copper Cable 10MM DC, Lighting Arrester, Solar Installation with concrete and finishing
Copper Cable 10MM DC
Installation of transformers with cable laying and termination, erection of 11KV 4-pole structure with accessories and inter-connection with existing 11KV and 415V system, earthing and all other associated service jobs, CAPEX 25-26.
Installation of transformer, 11 KV/ 433V ( 1250 KVA oil emerged with both side cable termination and earhting arrangement including erection of earth pit as per IS )