Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAdmitted-Finance | ₹29.8 L | L1 | Admitted-Finance |
| 2 | L2₹33.3 LAdmitted-Finance SURI DANGALPARA NEAR MOUM KALITALA BIRBHUM | SURI | BIRBHUM | WEST BENGAL | ₹33.3 L | L2 | Admitted-Finance |
| 3 | L3₹41.1 LAdmitted-Finance | ₹41.1 L | L3 | Admitted-Finance |
| 4 | L4₹48.4 LAdmitted-Finance | ₹48.4 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S NIMAI CHARAN GHOSH L2 | MELTEL L4 | SANGAM ENTERPRISES L3 | UNIT ELECTRIC WORKS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Installation of transformer, 11 KV/ 433V ( 1250 KVA oil emerged with both side cable termination and earhting arrangement including erection of earth pit as per IS ) | 1 | NO | 1,15,000 ₹1.1 L | 85,000 ₹85,000 | 32,000 ₹32,000 | 1,30,000 ₹1.3 L |
| 2.00 | Installation of transformer, 6.6 KV/11KV ( 2000 KVA oil emerged with both side cable termination and earhting arrangement including erection of earth pit as per IS ) | 1 | NO | 2,25,000 ₹2.3 L | 80,000 ₹80,000 | 25,000 ₹25,000 | 1,90,000 ₹1.9 L |
| 3.00 | Laying of Cable, 3CX185 sq. mm., Al, arm ( through existing cable trestle ) | 1,500 | Mtr | 115 ₹1.7 L | 160 ₹2.4 L | 110 ₹1.6 L | 65 ₹97,500 |
| 4.00 | Under ground cable laying, 11KV, 3CX185 ( sq. mm., Al, arm through brick protection ) | 2,000 | Mtr | 260 ₹5.2 L | 330 ₹6.6 L | 320 ₹6.4 L | 200 ₹4 L |
| 5.00 | Under ground cable laying, 1.1KV, 1CX630 ( sq. mm., Al, arm through brick protection ) | 150 | Mtr | 260 ₹39,000 | 310 ₹46,500 | 320 ₹48,000 | 190 ₹28,500 |
| 6.00 | Cable laying, 6.6KV, 3CX185 sq. mm., Al, ( arm through cable tray ) | 100 | Mtr | 400 ₹40,000 | 150 ₹15,000 | 110 ₹11,000 | 65 ₹6,500 |
| 7.00 | Supply & fixing of cast iron cable ( marker on concrete foundation along undergoung cable laying ) | 200 | NO | 450 ₹90,000 | 1,000 ₹2 L | 350 ₹70,000 | 450 ₹90,000 |
| 8.00 | Road boaring(6") with supply of HDPE ( pipe ) | 200 | Mtr | 1,395 ₹2.8 L | 1,600 ₹3.2 L | 2,025 ₹4.0 L | 2,500 ₹5 L |
| 9.00 | Supply & laying of GI pipe, 100mm dia ( Make: Tata (medium) ) | 100 | Mtr | 1,825 ₹1.8 L | 750 ₹75,000 | 2,000 ₹2 L | 1,200 ₹1.2 L |
| 10.00 | Supply of steel tubular pole, 11 mtr. ( long ) | 8 | NO | 29,000 ₹2.3 L | 17,000 ₹1.4 L | 21,500 ₹1.7 L | 13,000 ₹1.0 L |
Tender Value
Refer Docs
EMD Value
₹72,780
Closing Date
27 Oct 2025, 5:00 pmClosed
The General Manager BKTPP
Bakreswar Thermal Power Project P.O. - BkTPP, District - Birbhum Pin - 731104
Installation of transformers with cable laying and termination, erection of 11KV 4-pole structure with accessories and inter-connection with existing 11KV and 415V system, earthing and all other associated service jobs, CAPEX 25-26.
2025_WBPDC_898584_1
WBPDCL/BKTPP/NIT/E3858/25-26
Open Tender
Miscellaneous Services
365 days
Bakreswar Thermal Power Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹72,780
Yes
At the chamber of HOD(CC)
16 May 2026
12 Sept 2025
25 Nov 2025
12 Sept 2025
27 Oct 2025
20 Sept 2025
19 Sept 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_2027854.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid