Construction of 220KV D/C Transmission Line from PMTL, Chandauti to IMC ,Dobhi (RL - 22.9 KM ) with ACSR Zebra Conductor along with Construction of 02 nos. 220KV Line Bays at Chandauti PMTL Substation on Turnkey basis.
9.1 48 Fibre (DWSM) OPGW Fibre Optic Cable including Sag & Wastage KM 22.9 0.00 0.00 0.00 0.00 0.00
Provisioning of Network accesories for setting up of Internet
Laying of OFC
RFP for Selection of Event Management Company for the conduct of Huddle Global 2026
Optical Fiber Cable with Drum
Transmission Line Work-2026-27/01 - Construction of 4.30km, 220kV DC LILO Transmission Line connecting 220kV Kanhirode Ambalathara feeder at Velichemthodu to the proposed 220kV substation Cheemeni village in Kasaragod district.
Fibre Optic approach Cable- 48 Fibre
BID FOR CONSTRUCTION OF VARIOUS TRANSMISSION ELEMENTS (VARIOUS 220KV AND 132KV TRANSMISSION LINES) ASSOCIATED WITH 220KV GSS MALPURA (DISTRICT - TONK)RVPN/EHV/BN-9019002607 , UBN- VPN2627WLOB00994)
Installation Hardware set for 48 Fibre OPGW Fibre Optic approach cable
S&T works for Augmentation of Water Supply Arrangement by construction of sedimentation tank at Adityapur station.
... loading/unloading of Kilometre Optical Fibre Cable along with HDPE pipe from ...
Provision of CCTV Surveillance system at six nos. of goods sheds (viz.- RDR, VAA, RUI, CRS, BQA (new) & BKEC) in Adra division.
... including loading/unloading of Optical Fibre Cable along with HDPE pipe from ...
Construction of 220/132 kV GSS BUDHADEETH (Distt.- KOTA) including survey, supply of all equipments/materials, Erection (Including Civil Works), Testing and commissioning on Turnkey Basis under BN-9018002605
Fiber optic cables, connectors, ethernet cables, jack panels connectors, patch cords etc. for completing the Substation LAN as per specification requirements.
Provision of IP-MPLS based network for Unified communication Back-bone & VOIP based control communication system with associated LAN infrastructure at variousstations of LJN, BSB, IZN Divisions & HQ Control Room over North Eastern Railwayand TCP-IP ... based fire fighting ... & OFC infrastructure ...
Supply of Single mode 6 Fiber Armoured Optic Fibre Cable outdoor. Make: MOLEX, AMP, ...
Diversion of submerged tower locations 400 kV Pavagada_Hiriyur Mysore Dc Line under Hiriyur TLM_Survey, Foundation, Tower Erection/Dismantling, Destringing and Stringing
24 85371000 18% confirmed WAMS Miscellaneous - Armored Fibre Optic Cable and associated termination (e.g. L2 Switch) for connecting PMU panels EA 1 Included 0.00 0 0