Loading…
Loading…
496 results • Best match
Selection of an Agency for Designing, Developing, Managing, and Implementing a Command and Control Centre (CCC), including Survey of Properties and Installation of RFID Tags, CCTV Surveillance System and Other IT-enabled Infrastructurein the Municipa
Coupler and Splitter – Optical fiber coupler and splitter unit
Supply and Installation of Network in Nursing Department at GJUS and T Hisar
SERVICES: OFC Cable Laying underground, on walls etc. Through machine *
Equipment
1. Thermal block with 96 well based system, with the flexibility to use 96 Well plate or 0.2ml Tubes for Reaction set up 2. The block of the system should be made of Silver, and wells of the block should be coated with Gold to provide excellent Ramp Rate and Thermal uniformity during the run 3. System should provide High Ramp Rate with Heating Rate of 8°C/s and above and Cooling Rate 6°C/s and above minimum. 4. Temperature Uniformity :- ±0.15°C at 55°C, ±0.25°C at 72°C and ±0.50°C at 95°C 5. Thermal Performance of the System:- Range 3 – 99°C; control accuracy ±0.1°C 6. Number of Samples Per Run:- 1 x 96-well microplate with optical film; 12 x 8-well strips 0.2 ml with optical lids; 96 x 0.2 ml individual vessels with optical lids 7. System should be open to use Plasticware and Chemistries from different vendors 8. Sensitivity of Detection:- 1 nmol/l FAM at 30 µl sample volume in a 96-well PCR plate 9. Sample volume to be used on the System:- 5 – 100 µl per well 10. The system should be enabled shorter cycling times down to less than 30 minutes for 40 cycles for fast cycling chemistries. 11. System should provide Gradient feature with two different modes standard and linear with step options. 12. Detection time of the System:- Should be enabled with fast plate reading 96-well plate (single measurement, 5 colors) approximately 6 sec regardless of the number of filters. 13. Detection Technology:- Detection module should be PMT Tubes, with multiplex detection ability up to 5 Target without need of ROX dye as passive reference. 14. System should have 5 or more excitation and emission technology in a single well. 15. The system / software should allow users to select individual channels based on the experimental requirement. 16. Detection module should use 8 optical fibers fixed on shuttle system to scan fluorescence of samples from each row on the block during the run. 17. System should support following Real time PCR Applications:- Endpoint, Relative Quantification, Absolute Quantification, Melt curve Analysis and Target Detection. 18. The system should provide unlimited number of user licenses which should be available from website. Supportive documents are required. 19. The System should follow MIQE Guidelines, Analysis report should be available as per MIQE Guidelines. 20. The software of the system should provide access options for the end user to run the system as User, Supervisor and Administrator. 21. Should be supplied with suitable Plastic wares, Kits and Reagents for running the system. 22. Additional laptop should be provided for analyzing the data. 23. Maintenance:- System should not require calibration for Detection module, Minimal calibrations should be required as a part of Maintenance. 24. Warranty:- Standard three years from the date of installation 25. Training:- The vendor should provide training to 3-4 users at the time of installation.
Provision of Public Address System at HW & adjoining locations.
Laying of OFC Cable/STP Cable/Power Cable/screened cable in conduit pipe/pvc channel/casing caping as per instructions of site engineer.
Supply, Erection, Testing & Commissioning of LILO to 400kV Mevasa from 66kV S/C Pragapar –Rapar line on D/C panther tower with AL-59 Conductor (Eq. Wt. to ACSR Panther Conductor) having Overhead line length 21.32Rkm under Anjar Circle. (Only OH Portion)
A.6.1 48 Fibre (DWSM) OPGW fibre Optic cable Km 21.350 195533.00 2385.00 1022.00 198940.00
3 LPE COATED CARBON STEEL PIPELINE LAYING AND ASSOCIATED WORKS IN Jehanabad GA (GROUP A)
Blowing of Optical Fiber Cable : - All activities pertaining to blowing of optical fiber cable in self lubricated HDPE Telecom duct (after testing of drum at site),through CS/ HDPE conduits at crossing, cable sealing, padding, backfilling etc. using all materials required, etc. all complete as per specifications and drawing provided in the bid document & as per direction of consultant.