Loading…
Loading…
505 results • Best match
Construction of 2x40 MVA 132KV AIS S/S Koushiya Sarai, Hardoi on turnkey basis
8.8 Optical fibre reqd. for SAS Lot 1
Request for Proposal (RFP) for Empanelment of Event Management Agencies for Invest UP(Retender)
... screen. with all electrical cabling including fibre optics cabling with data voice connecting ...
Construction of 2x40 MVA 132KV S/S Naseerpur, Firozabad on turnkey basis
8.8 OPTICAL FIBER CABLE Lot 1
Construction of 2x40 MVA 132/33KV UPEIDA IMLC S/S Naseerpur, Firozabad on turnkey basis
8.8 OPTICAL FIBER CABLE Lot 1
Construction of 2x40 MVA 132KV S/S Jagdishpur, Amethi on turnkey basis
Optical fibre reqd. for SAS
Construction of 2x63 MVA 132KV S/S Sector-10, Gautam Budh Nagar on turnkey basis
Optical fibre reqd. for SAS
Construction of 2x63 MVA 132/33KV S/S YEIDA Sector-10, Gautam Budhnagar on turnkey basis
Optical fibre reqd. for SAS
Construction of 2x40 MVA 132KV S/S Budaun on turnkey basis
OPTICAL FIBER CABLE
S&T work in connection with (i) construction of a limited-height subway in lieu of LC Nos.PK-6 & PK-24 and (ii) Construction of a limited-height subway in lieu of LC No. AM 39, AM-51 & MC-2 of Adra Division.
3.00 34734.00 Optical Fibre Cable along with HDPE pipe from ...
WC-4740 -Diversion of following Lines to facilitate the construction of Railway BG line from Ginigera to Raichur by SWR, Hubli under Raichur TLM in SR-1 (Deposit work On Behalf of SWR)
31 OPGW Cable 24 Fibre (DWSM) OPGW fibre optic cable 18% OPGW Cable 24 Fibre (DWSM) OPGW fibre optic cable KMS 1.460 0.00 0.00 0.00