Loading…
Loading…
495 results • Best match
Rajkot division-S&T Work in connection with (i) Providing ROB in lieu of LC No 135 at Km 755/0-1 Between KHDI - PDH section(2 lanes) (ii) Providing ROB in lieu of LC No 147 at Km 770/1-2 Between PDH - CX section(2 lanes) (iii) Proposed LHS in lieu of LC No. 92 at Km 698/1-2 bet LXR-WKR (iv) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout by 18m towards RJT.
Tool Kit consisting of Optical power meter (Fiber shot 9990V), Multimeter (Fluke101),Ethernet Crimping tool (Standard Make), Console cable (Cisco=RJ45-DB9), Wrist ripper 16 (Standard Make), Universal Spanner Set (Taparia), Screw Driver Set (Taparia-7 Pieces set), Cutting plier (Taparia), Wire Stripper, Industrial grade USB to Serial cable with all accessories or Similar. [Detailed Specification in Technical Document]. Inspection: Consignee (As per technical specification of tender condition)
Replacement of IPIS system at Belanagar, Begampur, Baruipara, Chandanpur, Masagram (5 STN) in suburban sections over Howrah division.
Supply and Installation of 19" rack mouted 24 port Fiber management Distribution 35 system and termination of OFC and Splicing of all the Fibers inside the Terminal Box with provision of taking out OFC as required. This includes supply of all Installation accessories including the pigtails with connector as per order of practice for installation and commissioning of Optical Fiber System. INSPECTION : CONSIGNEE.
Replacement of IPIS system at Belanagar, Begampur, Baruipara, Chandanpur, Masagram (5 STN) in suburban sections over Howrah division.
Supply and Installation of 19" rack mouted 24 port Fiber management Distribution 35 system and termination of OFC and Splicing of all the Fibers inside the Terminal Box with provision of taking out OFC as required. This includes supply of all Installation accessories including the pigtails with connector as per order of practice for installation and commissioning of Optical Fiber System. INSPECTION : CONSIGNEE.
Provision of TIB at Talandu, Simlagarh, Debipur, Bagila, Boichigram, Garifa, Hooghlyghat stations in suburban sections over Howrah division.
Supply and Installation of 19" rack mouted 24 port Fiber management Distribution 38 system and termination of OFC and Splicing of all the Fibers inside the Terminal Box with provision of taking out OFC as required. This includes supply of all Installation accessories including the pigtails with connector as per order of practice for installation and commissioning of Optical Fiber System. INSPECTION : CONSIGNEE.
Construction of building including clean room facility (class 100000 In working condition)
39.20.1 6 Core Multi Mode Optical Fiber Cable meter 200 87.00 17,400.00
Howrah Division- Signalling work in connection with- Schedule A1-SIGNALLING cost for Proposal for extension of existing FOB towards western side at Nalhati station under Sr. DEN/4/HWH. Schedule A2-Telecom cost for Proposal for extension of existing FOB towards western side at Nalhati station under Sr. DEN/4/HWH.
Supply and Installation of 19" rack mouted 24 port Fiber management system and termination of OFC and Splicing of all the Fibers inside the Terminal Box with provision of taking out OFC as required. This includes supply of all Installation accessories including the pigtails with connector as per order of practice for installation and commissioning of Optical Fiber System. INSPECTION : CONSIGNEE. Above/