Loading…
Loading…
2,106 results • Best match
D-LINE Fiber Optic Patch Cord Brand: D-LINE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687724830604 dt.23/05/2026)
Network cable laying work at TNPL Unit-1 and Cement Plant -ICT dept
Laying of OFC Cable in 1'' or 2'' GI pipes in cable trench of 1 Mtr depth including excavation of 1 Mtr depth cable trench, back filling and leveling,
3J3 Simplex Fiber Optic Patch Cord SC - SC Brand: 3J3 (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687776852192 dt.23/12/2025)
Construction of New Passenger Terminal Building for Domestic Operation at Jodhpur Airport. SH Provision of additional CCTV Cameras at New Passenger Terminal Building, Jodhpur
Supply and laying of 6 core, optical fiber cable (Make: Commscope), meeting technical specifications etc. complete as required.in the existing Raceway/Cable Tray /Conduit etc. complete as required.
BALANCE OFC WORK UNDER RANCHI GA FOR CITY GAS DISTRIBUTION NETWORK
All activities pertaining to Blowing / Laying of optical fiber cable in same pipeline trench inside 40 mm HDPE telecom duct (after testing of OFC drum at site), through CS/ HDPE conduits at crossing, testing of OFC before Blowing/laying, cable sealing etc. using all materials required complete as per specifications and drawing provided in the bid document & as per direction of EIC. (spare loop of 10 Meter at Blowing Pit, 20 Meter at Jointing Pit & 20 Meter at each station on wire-mesh (if applicable) shall be provided- No payments for laying shall be made for these spare loops) Unit of measurement shall be the running meter (RM) measured of the pipeline route.
Bullet Camera, NVR, Hard Disk, Media Converter, HDMI Extender, Power Cable, UPS, OFC, Installation Charges
Optical Fibre Cable (OFC) (2 Core)