Loading…
Loading…
2,153 results • Best match
SUPPLY, INSTALLATION AND COMMISSIONING OF ACADEMIC LAB EQUIPMENTS WITH 1 YEAR ONSITE WARRANTY
6 Quartz optical fiber 400um and 200um, VIS/NIR item6 1 No. 0 Excess(+) Full Conversion INR
MODIFICATION/ RAISING/SHIFTING OF EXISTING 132KV S/C SAKATPURA MAHAVEER NAGAR LINE AND 132 KV SAKATPURA-IA LINE AND 132 KV DADABARI-IA LINE AS DEPOSIT WORK OF KOTA DEVELOPMENT AUTHORITY,KOTA INCLUDING DETAILED ROUTE SURVEY, INSTALLATION and COMMISS
H/W SET-24 FIBER OPGW FIBER OPTIC CABLE
Construction of Multi Level Car Parking MLCP having G plus 4 floors RCC framed structure including Civil, Public Health Engineering, Electrical and Firefighting works at Anushaktinagar, Mumbai-400094
SPLICING: Termination of Optical fibre cable using fusion termination method, testing and commissioning with all accessories all as per instruction of Engineer in charge. (In Fibre Splice box)
Supply of Stationery/ Forms and Printing/ Misc (Computer Related)items as follows for upcoming Assembly Election-2026 and Bye Elections (if any)
Joint Colsure for Fiber Optical Cable Good quality
Renovation works to the Education section at corporation main office in ward no 82 Central Zone
14.Supply, installation and termination of Data points and LNA cabling and other required CAT6 UTP cables and Optical fiber cables along with accessories as per instruction of departmental officers including all cost etc complete.
Construction of ESRs for improvement of water supply to 2nos Zones near Kamalabada, Kenduguda with other ancillary work of Kotpad NAC
OFC: Supply and laying of 12Core unarmoured optical fiber cable (OFC Fiber glass with F-G 52.5/125Micron, 2.6DB/ KMF600) to various sites through HDPE Pipe/ in Air (Pole to pole) prelaying testing of each cable durm for each fiber and thaing the OTDR tracs, submission of OTDR traces (iin hard as well as soft copy ) to EIC/ Site Engineer.