Loading…
Loading…
2,200 results • Best match
SITC of CCTV Camera System for Security purpose at malviya Nagar Ward No 142, Krishna Nagar-II Lalkothi Jaipur
Supply, Drawing and OLTS Testing, of stranded OS2 Single mode (9/125 µm) glass optic fiber cable G652D as per latest ammendments of TIA/EIA 568/ISO/IEC with outer sheath, cable should be used for LAN and WAN back bones, for indoor/outdoor installations these sheathed cable be placed in existing MS/PVC /HDPE Conduits/ slotted channels with ferruling at both ends for identification complete in all respect.
SITC of LAN wiring for IPBX System in RLA Jaipur.
Supply, Drawing and Testing, of stranded Multi mode (50/125 µm) glass optic fiber cable, as per latest ammendments of TIA/EIA 568/ISO/IEC 11801:2011/ IEC 60794-1-2 E1, E3,E11, F1/ EN 50173-1/ EN 187 000/ IEC 60974-2, 2-20, 2-21/ ITU G.652D, construction of LSZH outer sheath cable, cable should be used for LAN and WAN back bones, . With its LSZH sheathing these cables should be ideal for indoor/outdoor installations in existing MS/PVC /HDPE Conduits/ slotted channels with ferruling at both ends for identification complete in all respect. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR .
Beautification Work at Chorasiyawas talab, Ajmer
Add Extra for Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade direct in ground including excavation of trench of size 75 cm (Depth) x 35 cm(Width) , with procedure as per following points:- (a) Make a river sand bed of height 125 mm along the trench, (b) Lay the cable in the middle of the trench, (c) Provide river sand bed of height 125 mm on top of the cable, (d) Lay the protective Common burnt clay F.P.S. Bricks of Class designation 75 / Sand stone slabs of 50 mm thickness and 225 mm wide just above the sand bed vertically across the cable ( Approx. 9 no. Bricks per Mtr.), (e) Backfill the excavated soil leaving 300 mm from the Ground level, (f)Lay the Cable warning tape and again back-fill the remaining portion of the trench upto the ground level and compacting the earth
Construction of Mortuary, Laundry, Manifold and Other miscellaneous work at Construction of Phase II of medical college and Upgradation of Hospital at Pali, Rajasthan
Excavation of trench of size 75 cm (Depth) x 35 cm(Width) for laying of suitable no. of LT cables (Inter spacing between cables should not be less than 2 D) in ground with following procedure :- (a) Make a river sand bed of height 100 mm along the trench, (b) Lay the cable in the middle of the trench, (c) Provide river sand bed of height 100 mm on top of the cable, (d) Lay the protective Common burnt clay F.P.S. Bricks of Class designation 75 / Sand stone slabs of 50 mm thickness and 225 mm wide just above the sand bed vertically across the cable, (e) Backfill the excavated soil leaving 300 mm from the Ground level, (f)Lay the Cable warning tape and again back-fill the remaining portion of the trench upto the ground level and compacting the earth.
Construction of New Satellite Hospital Harmada, Distt. Jaipur. (Including Internal Electrical Work) (State Head)
Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed Arrmoured Aluminium cable confirming to IS:1554 P-I / IS :7098 P - I of 1.1 KV with H4- Grade electrolytic aluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831 in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cable tray(with cable tie) including testing etc. as required of following size. OEM must have it's own in house NABL accrediated Laboratory for testing procedure as per IS:10810.For additional technical parameters of product / work refer Annexure 'A' attached with this BSR
Electrification Work of I.T.I. Building at Gagriya, District-Barmer
Add Extra for Laying of one number additional PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade direct in ground in the same trench in one tier horizontal formation including excavation of trench of size additional 20 cm in width, with procedure as per following points :- (a) Make a river sand bed of height 125 mm along the trench, (b) Lay another cable in middle of trench in such manner that spacing between another cable is 20 cm., (c) Provide river sand bed of height 125 mm on top of the cable. (d) Lay the protective Common burnt clay F.P.S. Bricks of Class designation 75 /Sand stone slabs of 50 mm thickness and 225 mm wide just above the sand bed vertically across the cable ( Approx. 9 no. Bricks per Mtr.), (e) Backfill the excavated soil leaving 300 mm from the Ground level, (f)Lay the Cable warning tape and again back-fill the remaining portion of the trench upto the ground level and compacting the earth.