Loading…
Loading…
15,370 results • Best match
Thorough body repairing and full painting of 14 Nos Trailers (1.5 Cum Capacity) Under GRU/SWM-II Deptt.
Cost of Thorough body repairing and full painting of 14 Nos Trailers (1.5 Cum Capacity) Under GRU/SWM-II Deptt. as per tender T & C.
WHITE WASHING, COLOUR WASHING, DISTEMPERING, PAINTING OF RESIDENCIAL/NON RESIDENCIAL BUILDING UNDER SUB DN. NO.-1 & 2 KATGHORA
REPAIRS TO SECURITY /COMPOUND WALL FENCING, STEEL GATES ETC AT CERTAIN LOCATION INCLUDING PAINTING AT MILITARY STN JAMNAGAR
S & F Mild steel works with angle iron,flat iron etc as in posts,struts in fencing incl cutting tops to shape as directed, drilling holes, notching for wire etc flat iron fillets (for securing wire mesh etc) including all necessary drilling,bolting or riveting etc and similar work confirming to Fe-290 Gde E-165.Hand rails, Half round or other steel section or core for wooden hand-rail straight portion , drilled and countersunk for balusters, nosing to steps including embeding in concrete and screwing etc wind ties for roof including securing bolts, posts and struts in fencing including cutting tops to shape as directed,drilling holes,notching for wire etc, flat iron fillets (for securing wire mesh etc) including all necessary drilling,bolting or riveting etc and similar work conforming to Fe-290 Gde E-165 complete all as specified and as directed by Engineer-In-Charge.
Construction of pedestals, strengthening of steel structure and structure painting for ash disposal pipeline at STPS Plant, Suratgarh
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Cleaning and Painting the External Surface of Wind Tunnel with epoxy/ Heat Reflecting Paints at NWTF, IIT Kanpur
Cleaning and Painting the External Surface of Wind Tunnel with epoxy/ Heat Reflecting Paints at NWTF, IIT Kanpur.
Repair, maintenance and painting of RHR gate No.20, 21 and 24 (upper and lower) at Nangal Dam
Painting of 3 coat on metaled surface with CA-50 paint including brushes sundries & scaffolding and including cost of CA-50 paint (AOR) (Through rate).