Loading…
Loading…
16,066 results • Best match
WELCOME MAINT AND CERTAIN B/R REPAIR WORKS AT OFFRS MD ACCN (P-TYPE) AT SHANKAR VIHAR OF AGE B/R-II UNDER GE (SOUTH) DELHI CANTT-10.
(d) Electrical fittings such as tube lights, bed lights, switch boards etc. shall be carefully taken down before commencement of painting work and refixed after completion of painting work. (e) Furnitures in the quarters shall be shifted and stored in one room before commencement of painting work and rearranged to original position after completion of work. (f) Entire quarters including flooring, doors and windows shall be cleaned by the contractor after completion of painting work. (g) The rates quoted by the tenderer shall be deemed to include all the above provisions and nothing extra shall be paid on this account.
Construction of Dwar Maharshi Ved Vyas Janam Sthali on Sindhan Mor in Pailani Dera At Gram Panchayat Paillani.
Painting work with three coat of appd. Synthetic enamel paint with one coat of primer
Construction Of Dwar Maharaja Khet Singh on Baberu Bypass at Banda Bypass.
Painting work with three coat of appd. Synthetic enamel paint with one coat of primer
WARD NO 04 PRATHMIK VIDHYALAY KAJHA KHURD NO 01 KA KAYAKALP
wall painting two coat prime distemper on new work included all competed work (s.i no 649+650) with Pite
PERIODICAL SERVICES TO CERTAIN BLDGS INCL OTHER MISC B/R REPAIRS ETC IN TECHNICAL AREA AT AF STN PURNEA UNDER AGE (I) (AF) PURNEA
Material and labour for complete removal of existing treatment and preparation of old decorated painted surface of walls and applying two coats of cement base paint over a coat of alkali resistant primer, complete all as specified and as directed. Note:- (i) Painting work carried out upto 30 feet height, Quote the rate considering this aspect. Nothing extra will be paid on account of this. (ii) Second coat will only be carried out after 12 Hrs of first coat.
PERIODICAL SERVICES AND MISC REPAIR TO MD ACCN AT AF STN PURNEA UNDER AGE (I) (AF) PURNEA
Material and labour for complete removal of existing treatment and preparation of old decorated painted surface of walls and applying two coats of cement base paint over a coat of alkali resistant primer, complete all as specified and as directed. Note:- (i) Painting work carried out upto 30 feet height, Quote the rate considering this aspect. Nothing extra will be paid on account of this. (ii) Second coat will only be carried out after 12 Hrs of first coat.