Loading…
Loading…
14,798 results • Best match
Repair and maint of 11KV and 33 KV HT elect installations including connected items such as transformers VCBs CT PT God DO fuses AVR cables etc at Sonamarg incl HAWS under GE 970 EWS
... the coil, keeping the coils in electric oven chamber for 24 hrs to remove the moisture, Painting of complete transformer body from outside and inside by weather proof type using spray... transformer oil including dehydration, reinstalling the top cover after cleaning and painting of housing, conservator tank, expulsion vent etc, Meggering the LT and HT side of the ...
Repair/Maintenance of pipeline, control valves, switch gears and allied works at 14 EME, 222 ASC, Tushar Vihar, 874 A Coy, 57 WEU and other locations under GE (Utilities) Udhampur
... all as specified and directed by the Engineer-in-Charge. (e) Material and labour for painting of inner surfaces of the vessel with two coats of Anti Corrosive Black paint suitable for drinking water purpose over one coat of primer. (f) Material and labour ...
Annual Mtc. Of pipeline and other misc works related to pipeline of Rajabhat WSS under Alipurduar Division, P.H.E. Dte. (For 12 months)
... and repacking and consolidating the gap around the post with cement concrete (1:3:6) painting 2 coats including cost of nails bolts and nuts etc complete in all respect as per direction... nuts etc complete in all respect as per direction of the E.I.C. Payment of concrete and painting to be made separately. (PWD Schedule P-223 Item No.-47 i) 600mm X 450mm. Size of Board
Annual Mtc. Of pipeline and other misc works related to pipeline of NimtiDomohani WSS under Alipurduar Division, P.H.E. Dte. (For 12 months)
... and repacking and consolidating the gap around the post with cement concrete (1:3:6) painting 2 coats including cost of nails bolts and nuts etc complete in all respect as per direction... nuts etc complete in all respect as per direction of the E.I.C. Payment of concrete and painting to be made separately. (PWD Schedule P-223 Item No.-47 i) 600mm X 450mm. Size of Board
Annual Mtc. Of pipeline and other misc works related to pipeline of Atiabari WSS under Alipurduar Division, P.H.E. Dte. (For 12 months)
... and repacking and consolidating the gap around the post with cement concrete (1:3:6) painting 2 coats including cost of nails bolts and nuts etc complete in all respect as per direction... nuts etc complete in all respect as per direction of the E.I.C. Payment of concrete and painting to be made separately. (PWD Schedule P-223 Item No.-47 i) 600mm X 450mm. Size of Board
Annual Mtc. Of pipeline and other misc works related to pipeline of Nimtijhora WSS under Alipurduar Division, P.H.E. Dte. (For 12 months)
... and repacking and consolidating the gap around the post with cement concrete (1:3:6) painting 2 coats including cost of nails bolts and nuts etc complete in all respect as per direction... nuts etc complete in all respect as per direction of the E.I.C. Payment of concrete and painting to be made separately. (PWD Schedule P-223 Item No.-47 i) 600mm X 450mm. Size of Board