Loading…
Loading…
34,666 results • Best match
Drilling of 6 an half inches dia bore well, Supply Delivery and erection of suitable submersible pump set laying and jointing of HDPE pipe line work at Raghavendra Colony Park-1in Circle -55. Jeedimetla, Quthbullapur Zone , CMC
Drilling of 6 an half inches dia bore well, Supply Delivery and erection of suitable submersible pump set laying and jointing of HDPE pipe line work at Vishambari Colony OS -2in Circle -52, Kukatpally, Kukatpally Zone, CMC
Drilling of 6 an half inches dia bore well, Supply Delivery and erection of suitable submersible pump set laying and jointing of HDPE pipe line work at AG Colony Park -2in Circle -60, Medchal , Quthbullapur Zone , CMC
Laying of RCC NP3 300 mm dia drain pipe line from H.No.5-40 to Adarsha Yuvajana Sangam Junction at Malkapur in Division No.16 of Municipal Corporation, Karimnagar Est. cost of Rs. 5.00 Lakhs under MGF
Restoration of rain damages to various LWSS WSS under Jal Shakti Division Dharampur Bharari in Tehsil Dharampur Distt. Mandi HP (SH. Laying, Jointing and testing of GMS pipe line of various dia at various schemes) under PDNA
Drilling of 6 an half inches dia bore well, Supply Delivery and erection of suitable submersible pump set laying and jointing of HDPE pipe line work at Sri Sai Avenue Park Circle -60, Medchal, Quthbullapur Zone , CMC
Restoration work of Black top surface and hard shoulder due to damage for laying of pipe line by Barasat Division PHE Dte. along Bongaon-Bagdah-Boyra Road from 12.90 km to 14.298 km under Barasat Division, PWD
Laying left out portion of 90 mm dia UPVC pipe line ( 3991.00 mtr ) with allied works to facilitating the FHTC connection for Bainchberia Water Supply Scheme under Tamluk Sub-Division of Tamluk Division, PHE Dte. ( Part-A)
Dismantling of CC Road and Pipeline work In Ward Nos. 20 and 16 near the Fund Office, opposite Venkataramana Temple, near the house of retired teacher Vijayalakshmi, in front of the Jain temple in Ward No. 16, and near Renuka Provision Store up to the stream
Dismantling of CC Road and Pipeline work In Ward Nos. 20 and 16 near ...
Providing and Laying PVC pipe and Siltcatch pits at various water stagnated locations in Div-64, Unit-15, Zone-6
Supplying and laying of pipe line including construction of valve chamber and wash out in different places under Madhyamgram Municipality.
Construction of road and laying of PVC pipe near HO Meenu in Masanda Patti in ward no 2 MC Banga.
Annual Zonal Contract - Zone-B6 :MPK SECTION - Maintenance of all buildings, FOB and roads in Chennai Beach, Chennai Fort, Chennai Park and island exhibition ground ; Zone B7- MAS - Maintenance of Station and service buildings, old concourse, ... 7, water supply ... supply pipeline arrangements, ... carriage watering etc.,; ... 11, water supply, ... of water supply ... Yard water supply ... supply pipeline , ...
Work regarding the replacement of an 85mtr long, 90 mm diameter pipeline in Ward No. 06, Azad Nagar specifically in the lane next to Dr. Bengali clinic, opposite the Goods Shed, stretching from Mr. Rajesh house to Mr. Pramod house.
S/F of specials (fitting as socket, elbo, Reducer, Tee solvent, etc. for laying, Jointing PVC Pipe line. (Old rate contract Jalkal Firozabad)
Providing and laying of 350mm and 450mm dia RCC NP-3 pipe Storm Water Line from H.No679 toH.No.293 at Sector-21D adjacent streets and Mini Disposal Storm Water Pumping and new Mini storm water W.no.17(New Ward) Badkhal Constituency, Faridabad(Recall)
... after making connection laying of pipe and with safety equipments ...
Providing and Laying a new water pipe of 50, 100 and 150 mm diameter in order to ensure smooth water supply in the area of Dnyaneshwar Nagar/Dr. Gangadhar Nagar Under Magasvargiy Nidhi in Lokmanya Savarkarnagar Ward Committee.
Estimate for Providing and laying 200mm dia SW pipe line with manhole and providing of 80mm thick Interlocking paver blocks in gali no. 5A, 5B and tower wali gali in Shree Ram colony ward No.-35 Faridabad. (Recall)
Restoration of damaged black top and Hard shoulder of Gobardanga -Thakurnagar Road from chainage at 5.10 km to 4.04 km due to laying of water pipe line by MED in area of Gobardanga Municipality under Barasat Division PWD.
PROVIDING, LOWERING , LAYING ,JOINTING AND TESTING HDPE 140 MM DIA 6 KG/CM2 PIPE AND 75 MM DIA PVC 4 KG/CM 2 PIPES FOR ADDITIONAL DISTRIBUTION SYSTEM FOR GRAM PANCHAYAT UMARI (MEGHE) VILLAGE UNDER RR WATER SUPPLY SCHEME , TAH.WARDHA, DIST.WARDH
PROVIDING, LOWERING , LAYING ,JOINTING AND TESTING HDPE 140 MM DIA 6 KG/CM2 PIPE AND 75 MM DIA PVC 4 KG/CM 2 PIPES FOR ADDITIONAL DISTRIBUTION SYSTEM FOR GRAM PANCHAYAT WAIGAON (NIPANI) VILLAGE UNDER RR WATER SUPPLY SCHEME , TAH.WARDHA, DIST.WA
PROVIDING, LOWERING , LAYING ,JOINTING AND TESTING HDPE 140, 110 MM DIA 6 KG/CM2 PIPE AND 75 MM DIA PVC 4 KG/CM 2 PIPES FOR ADDITIONAL DISTRIBUTION SYSTEM FOR GRAM PANCHAYAT SAWANGI (MEGHE) VILLAGE UNDER RR WS SCHEME , TAH.WARDHA, DIST.WAR
Installation of Pump at new PH and ancillary connection from new installed point by laying of MS pipe at Nabasta Major RLI Scheme, Block Bhatar under Burdwan (Agri-Mech) Sub-Division under Burdwan (Agri-Mech) Division under Non Plan.
... from new installed point by laying of MS pipe at Nabasta Major RLI Scheme, ...
Remodelling of SWD by 900 mm Dia Pipeline and Laying of CC Patch from Metro Pillar No. A1452 (Shop No. 9/A, Sy. No. 127/1) to Metro Pillar No. A1447 (Market Gunj Gate) in Market Gunj, Old Malakpet, Ward-91, Moosarambagh, Circle-29, CRZ, GHMC. Rs 20.50 Lakhs
A PIPELINE (200M) IN BOTH SIDE OF ROAD FROM ABUL KALAM AZAD HOUSE TO MD SAGIR ALAM HOUSE AT MASHALDA BAZAR FOR DE WATER LOGGING UNDER MASHALDA GP APAS ID NO APAS/01/046/186/0014,UNDER MASHALDA GRAM PANCHAYAT.
Water supply arrangement including maintenance of pipeline at Belpukur Bus Buffer Zone within Kulpi Block in connection with Ganga Sagar Mela-2026 under RWS Alipore Sub-Division PHE Dte. in the Dist.of South 24 Parganas of Alipore Division, PHE Dte.
Rep. and Maint. of water supply pipeline(C(D/S),B (S/S),Hospital,Guest House),Lowering and lifting of submersible pump into existing borewell (Urjanagar colony,Dhankunda area office)and Operation of departmental pump at C-Type qtrs atUrjanagar colony
Supply and Delivery of PVC Pipes, RR Couplings, CI D-Joints, HDPE Collars, Saddles, MS Flanges, Sluice Valves, and Other Required Materials for Attending Water Supply Distribution Pipeline Leakages in Wards No. 1 to 43 of Siddipet Municipality under General Funds.
PROVIDING AND LAYING OF RCC PIPE WITH HDPE INNER LINNING OF 700 MM I/D DUE TO DAMAGED EXISTING SEWER LINE, CONSTRUCTION OF MANHOLES, CONSTRUCTION OF ROAD GULLIES FROM CHAWLA TRAFFIC LIGHT POINT TO MATAUR CHOWK, PHASE 3B2, S.A.S. NAGAR
... Tender Title: PROVIDING AND LAYING OF RCC PIPE WITH HDPE INNER LINNING ...
REPAIR REPLACEMENT RE ROUTING OF OLD CEMENTED CI DI GI WATER PIPELINE SYSTEM OF CASD AREA RASHTRAPATI BN AREA DAD PANCHWATI AREA NAUSENA BAGH AREA DCN PALAM AREA PIRU VIHAR VIKRAM BATRA VIHAR CVD DEPOT OSG SAKURBASTI 60 INF BDE AREA SIGNAL GROUP AREA
... type of soil for taking out/laying of pipe complete all as specified ...
A/R AND M/O TO VARIOUS ROADS PWD DIVISION NW R-1 UNDER SUB DIVISION NWR-15 DURING 2026-27 (SH PROVIDING AND LAYING BELL MOUTH PIPE FOR RAIN WATER DRAINAGE AT VARIOUS ROADS UNDER SUB DIVISION NWR-15).
... 2026-27 (SH PROVIDING AND LAYING BELL MOUTH PIPE FOR RAIN WATER DRAINAGE ...
CO RCC Intake Structure, CO WTP 5.80 MLD Cap., CO Pump House 1st stage at Kodhra, Providing and Fixing of Gaseous chlorination Plant, Providing and fixing of UV Plant, Providing, Laying, Jointing Testing of GMSERW Pipe for Rising main Booster,
Providing and laying GMSERW pipe for casing of 450 mm dia L210 4.80 mm thickness
8293 REPAIR/REPLACEMENT OF WATER SUPPLY PIPELINE VALVES AND REPAIR TO MOTORS AT INS VAJRABAHU, NAD, NEW FOTILLA NIWAS, DGNP, CG COMPLEX, CCDT, CNAI, LWT AND HQ WNC AND CONNECTED BLDG ETC OF HQ WNC AND HQ MNA UNDER GE (NW) KUNJALI
Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth for foundation/laying of pipe etc and getting out in hard dense soil complete all as specified.
1) DEVELOPING OF ROAD IN WARD NO. 2 INTERNAL SAMARTHNAGAR AREA FOR AMC (2) CONCRETING OF ROAD IN WARD NO. 7 INTERNAL KHALEKAR HOUSE TO AZAD CHOWK FOR AMC (3) LAYING RCC PIPE GUTTER IN WARD NO. 7 INTERNAL KHALEKAR HOUSE TO AZAD CHOWK FOR AMC .
... TO AZAD CHOWK FOR AMC (3) LAYING RCC PIPE GUTTER IN WARD NO. 7 INTERNAL ...
Laying of 110mm HDPE Pipe line From Near H/o Shri Mahmood to Near H/o Shri Sharif and near H/o Mahboob to near H/o Shri Salim in Moh. Gulzar Nagar, Ward No. 08 Jalalabad.
Drilling of Borewells, Upto 150m Depth ending from ground level and erection charges, Supply and delivery of HDPE Hose, Pipe Laying plumbing work in Arignar Anna street,Thirunavukarasu street 42/46 at Division 42, Ammapet Zone III.
Providing FHTC of Chanda, Gangrapota, Gobrapur and Kamalapur mouzas including laying of UPVC pipe with pile work under Augmentation work at Gangrapota W/S Scheme Bongaon block under of Bongaon Sub-Division under Barasat Division, P.H.E. Dte
Supply and Laying of Clear water Rising main pipe line for Water Supply With all other Associated Works including permanent Road Restoration work for 6.28 Km from Suryanagar Pump House to Kuilapur OHR within Asansol Municipal Corporation.
Improvement of Water Supply with New Laying of 110 mm HDPE pipe line with other allied works from 21/1, E Road (near Tara Maa Mandir) upto 21/5, E Road under ward no - 09 of HMC.
Work regarding the replacement of a 120-meter-long, 90 mm diameter pipeline in Ward No. 36 (Nagla Pachiya, Tower Wali Gali), extending from the house of Shri Natthi Lal to the houses of Shri Gore Lal and Nem Singh Rathore.
S/F of specials (fitting as socket, elbo, Reducer, Tee solvent, etc. for laying, Jointing PVC Pipe line. (Old rate contract Jalkal Firozabad)
Balance work under JJM at Village Barsobha and Bamhori Block Gunno based on TW. i.c pipeline, Sump well etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Laying of RCC Pipe Line for Agriculture farm of Maninder Singh So Pardeep Singh to Agriculture farm of Harpreet S so Gamdoor S and Agricultre farm of Maninder S So Pardeep S to Agriculture farm of Balwinder S So Raj S at Vill Husnar Dist Muktsar
Laying of RCC Pipe Line for Agriculture farm ...
REPAIRING OF PIPELINE LEAKAGES NEAR 64B SARSUNA MAIN ROAD, 71,13B,491/B,51/2 RAM ROAD, 13C,146/6,18/6,95A,52B K.D.ROAD,65,46,146/5 S.P.CHATTERJEE ROAD,31C,8/2,8/9 R.N.MUKHERJEE ROAD ETC. WITH ALLIED WORKS IN WARD NO 127, BR XIV
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / ...
Providing and laying of 4 inch DI water supply pipe line from Rotary Club to H. No. 94, Sector 18-A, Distribution line increase the water pressure under the charge of SDE MCPH Sub Divn. No. 11, Chandigarh
PROVIDING AND LAYING OF D.I. WATER SUPPLY PIPE LINE IN LEFT OUT AREA IN VARIOUS STREETS (NEAR LIBRARY AND BACK SIDE GURUDWARA SAHIB SAINI MOHALLA TO AVOID THE CONTAMINATION OF DRINKING WATER IN VILLAGE BURAIL, CHANDIGARH (Ch.To. VDF)
Providing and Laying Hume Pipe Culvert at RD 24/615, C/O Drain at RD 24/600 to 24/750, C/O R/Wall at RD 24/605 to 24/695, and Removal of Slips at Various RDs)
Laying of 110 mm HDPE Pipe line Front Shahnabaj house by Rijwan kirana store to Tahir house Murtza house by Jafar Quresi house to Musahid house Mohalla Ward no 18 in the limit of Nagar Palika Parishad Dhampu
Shifting of laying distribution system and construction of RCC Pillar for alligning of 140 mm Dia HDPE distribution pipe line of Bonpas Water Supply Scheme within Bhatar Block for construction of Bridge over irrigation cannel in replacement etc.work
Sub Head Construction of pump House cum attendant quarter construction of Sumpwell and Main Storage Tank 50000 liters capacity each construction of retaining breast wall laying jointing and testing GMS pipe in Rising main Heavy and Medium class layi
... soil separately and after laying, jointing of pipes returning the useable soil ...
Remodeling of SW Drain with 450mm Dia NP2 pipeline and laying of CC road from 18-7-425/77/24/A to Javeed Kirana General store at Bhavani Nagar in 79-Talabchanchalam, Yakutpura cir-26, CRZ, GHMC(Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs. 12.80 Lakhs
delivery bend, foot valve bend, installation of pump motor set (6000 GPM) with jointing 10IN delivery pipeline at Borira quarry, DOCP under C.V. Ara for dewatering of Mines water.(C)Replacement of one 2000 GPM Pump, another 1200GPM pump at pontoon