Loading…
Loading…
2,453 results • Best match
Provision of additional Loop and Shunting Neck for Loading and Un-loading at 3rd line at KOKA Station of Nagpur Division.
25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after 21 passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. For 60 Kg/60EI-R260 grade Rail, Single shot crucible fitted with Automatic Tapping Thimble Technology, 3 pieces Mould (Zircon washed) and Compressed Air Petrol heating technique.
HOWRAH DIVISION CESS REPAIRING - 172801 CUM Work in the following locations:- RPH - DUMK : SL 104.370 - 105.280 = 4550 CUM, 107.260 - 107.520 = 1300 CUM, 108.280 - 108.280 = 2500 CUM, 118.140 - 118.260 = 2376 CUM, 118.520 - 120.330 = 9025 CUM, 120.520 - 120.640 = 3360 CUM, 120.920 - 120.980 = 1920 CUM, 124.010 - 124.700 = 3450 CUM, 126.080 - 126.500 = 12936 CUM, 126.600 - 126.960 = 11088 CUM, 127.000 - 128.000 = 5000 CUM, 128.370 - 129.400 = 5150 CUM, 130.000 - 130.460 = 2300 CUM, 132.114 - 132.440 = 12960 CUM, 134.470 - 135.080 = 3050 CUM.128.41-128.89=24576 CUM, 128.92- 129.4=26880 CUM, 130.01-130.43 = 24192 CUM, 134.72-135.08=14688 CUM, 132.15-132.45=1500 CUM. under AEN/RPH Under jurisdiction of Sr. DEN/4/HWH.
Supply, providing, laying &fixing 5mm thick concrete canvas (flexible concrete impregnated fabric that hardness when hydrated to form a thin, durable waterproof and fire resistance concrete layer within 24hrs.) in Limited Height subway and other required work. The rate includes all the cost of lead , lift, loading, unloading, transportation, ascent, decent, crossing of Railway track, road, nullah wherever required, all contractor's labour, materials all taxes, royalty etc. and all the incidental charges to complete in all respect in all respect. Contractor shall submit all relevant test certificates of the materials. Mass of unset concrete canvas should be 75kg/m2
Bhavnagar Division: - Rebuilding of Arch Bridges (04 Nos) by providing RCC box under DEN (East) jurisdiction. (PRCL Section)
88.00 from track, duly digging / scarifying ballast by beaters / wire brushes or any mechanical means, leveling and dressing formation with specified cross slope after salvaging ballast, separating muck by screening the salvaged ballast with contractor's 20mm size sieve, stacking of screened ballast for measurement, disposing off muck at specified locations with all lead & lifts as directed by Engineer in-charge. Note: Payment shall be made for quantity of ballast stacked after screening of retrieved ballast from track. BHAVNAGAR DIVISION-ENGG/WESTERN RLY 25mm gap 'in-situ' welding during traffic block and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding shall be carried out only by trained welder having valid competency certificate using RDSO approved Alumino Thermit Welding Portions, 3 piece prefabricated mould (ZIRCON WASHED) manually pressed, Single shot crucible fitted with auto tapping thimble and Compressed Air Petrol/LPG preheating technique as per RDSO Specification No IRST/19-2020 with latest amendment. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Only required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. All other items required shall be supplied by the Contractor.
Rajkot Division:- Providing Additional Opening (3.0M X1.75M) at KM 961/7-8, 970/0-1, 974/8-9, 976/4-5,976/5-6, 978/5-6 and 979/7-8 under DEN (W)-RJT jurisdiction.
9.00 196044.19 16.3m and up to 26.00 using Road crane capacity of 80 MT Removal of temporary girder, crib on both ends and placing temporary girder on crib / cess away from Railway track as directed by engineer at site under traffic block; filling of Railway's earth by ramming, pulling ballast from stack / adjoining track / same track, laying track, linking with approach track and packing of ballast for opening track at 20 kmph speed, boxing & dressing of cess, ballast profiling etc. Note: If earth is to be brought by contractor from outside, the same will be paid separately.
(i) S&T work in c/w Raising of Passenger Platform no. 1 from Medium Level to High level along with extension upto 600 Meter at Chawapail station on UMB - LDH section. (ii) S&T work in c/w Raising of Passenger Platform no. 1 from Medium Level to High ... S&T work in ... Signalling work i.c.w.Shifting ...
Shifting of Apparatus case Single and it includes the Excavation of pit in and around the existing location boxes very carefully without damaging the working cables and shifting and turning the location boxes to clear of the infringement as instructed by the railway representative at 10 site. The work includes ensuring the safety of the signaling system, releasing the cables coils to give access for shifting/turning the location boxes. Necessary masonary work and earth work in and around the location boxes to the required level shall be done as instructed by the Railway representative at site, if the existing earth connection to the location boxes are disturbed the earth wires shall be the property reconnected. (All materials required for the work shall be supplied by the contractor).Inspection by: Consignee.
Linking of BG track, Points & crossing, collection, supply and spreading of track ballast at TRM station yard.
RM TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include : (1) Re- adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator, (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM; (4) Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re-setting of worked-out / fallen fittings. (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary; (10) Manual consolidation of ballast in crib / shoulders; (11) Removing and refixing of traction bonds during the block in electrified sections (12) Dressing of ballast Note: 1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile.