Loading…
Loading…
2,454 results • Best match
Wood Based Resin Impregnated Compressed Laminate, (Compreg Slat.)
Description :Wood Based Resin Impregnated Compressed Laminate, (Compreg Slat.) Specification: - C-9407 (Rev-4) TYPE-I,Size: 1810X540X4 mm, [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitt ed: Max 8 lacs ] ] Consignee Dy.CMMAMV/LKO, NR Uttar Pradesh 1055.00 Numbers UVAM Item ref. ( Item Id :- 2300161 - WOOD BASED IMPREGNATED COMPRESSED LAMINATES FOR USE IN RAILWAY COACHES , Sub Item Id:-2300161002 - WOOD BASED IMPREGNATED COMPRESSED LAMINATES FOR USE IN RAILWAY COACHES [RDSO Spec C 9407 Rev.04] ) Inspection Stage Inspection Not Required Details
Hiring of Agency for providing and fixing of Advertisement like Hoardings, sign board at the site of Category C MC Solan.
C' Catergories includes these sites: i) Dunga Mod. ii) Railway Station Parking. iii) Park Jaunaji Road. iv) Shoolini Parking. v) Shishu Park. vi) Netaji Subhash Chander Parking. vii) Rain shelter Opposite Surya Vihar.
Execution of SKV welding work along with all ancillary works under the jurisdiction of Assistant Engineer/Kanchrapara.
RM 25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track.
Maintenance of Double line Track in between New Khurja to New Boraki section between DFC Km. 851.300 to 897.00 including New Boraki Yard and IR connection of DFCCIL in EDFC under CGM/Tundla unit.
Set Total 61033.80 EDFC FIELD UNIT-TUNDLA-CIVIL/EDFC 155000CSM, Duomatic and 3X Sleeper Tamping Machines 155010"Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include :(1) Re- adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator, (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM;(4) Digging, screening and replenishment of ballast at mud pumping /rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Item- 18 Correcting displaced sleepers to position along with squaring; (8) Re-setting of worked-out / fallen fittings; 9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary;(10) Manual consolidation of ballast in crib / shoulders;(11) Removing and refixing of traction bonds during the block in electrified sections(12) Dressing of ballast. Note:1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile." S No. Item Description of Item Unit Qty Rate Amount No
"KGP Division"- Conversion of existing bridges into Composite girders/Ballasted decks for running of 25T Axle loaded freight trains @ 100Kmph in (a) Bridge No. 69 DN (Span 4x18.3m) in between station GTS-DVM Bridge No. 94UP (Span 2x18.3m) in between station JGM-GII (b) Bridge No. 217 UP (Span 9x18.3m) in between station RGT-ARD (c) Bridge No. 235UP (Span 9x18.3m) in between station BTS- NMBR (d) Bridge No. 235DN (Span 9x18.3m) in between station NMBR-BTS (e) Bridge No. 264UP (Span 9x18.3m) in between station HIP-BLS (f) Bridge No. 238 UP (Span 3x12.2m) in between station NMBR-ROP & Bridge No. 239 UP (Span 2x12.2m+2x18.3m) in between NMBR-ROP (g) Bridge 239 DN (Span 2x12.2m+2x18.3m) in between station ROP-NMBR & Bridge No. 258 UP (Span 4x12.2m) in between station HIP-BLS (h) Bridge No. 217DN (Span 9x18.3m) in between station ARD-RGT & Br. No. 234UP (Span 5x12.2m) in between station BTS-NMBR (i) Bridge No. 168DN (Span 4x12.2m+2x18.3m) in between station VKD-NYA & Bridge No. 176 DN (Span 3x12.2m) in between station BLDA-VKD." (2nd Call).
Linking of BG track (with TRM guard rail ) over ballasted deck bridges with any type of rail section and PSC sleeper i n c l u d i n g leading free rails/welded panels available along the alignment on to bridge, leading and spreading all fittings and fastenings, leading & spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails & guard rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. 3. This item shall be applicable only when track is with Guard Rail. Linking without guard rail be paid under relevant item for plain track linking. Through packing of track, as per procedure prescribed in latest edition of Indian Railways Permanent Way Manual
Wood Based Resin Impregnated Compressed Laminates 2850 x 1220 x 12 mm" Material Spec: RDSO, C-9407, Type - II (Rev-4) with latest revision and amendment.
Description :Wood Based Resin Impregnated Compressed Laminates 2850 x 1220 x 12 mm" Material Sp ec: RDSO, C-9407, Type - II (Rev-4) with latest revision and amendment. [ Warranty Period: 30 Months after the date of delivery ] ] DBRT WORKSHOP DEPOT, NFR Assam 2322.00 Numbers Consignee NBQ WORKSHOP DEPOT, NFR Assam 1000.00 Numbers UVAM Item ref. ( Item Id :- 2300161 - WOOD BASED IMPREGNATED COMPRESSED LAMINATES FOR USE IN RAILWAY COACHES , Sub Item Id:-2300161002 - WOOD BASED IMPREGNATED COMPRESSED LAMINATES FOR USE IN RAILWAY COACHES [RDSO Spec C 9407 Rev.04] ) Inspection Details Stage Inspection Not Required