Loading…
Loading…
2,438 results • Best match
Execution of Doubling of BG track between Ranaghat Jn.(Excl.) and Bangaon Jn.(Excl.) from Km 1.027 to Km 32.195 including Electrification & Signaling works.
Painting of existing HALF SIZE apparatus cases without disturbing the terminations and equipments inside. The 09 work involves scraping of old paint, applying two coats of Aluminium paint outside & two coats of white paint inside apparatus cases, painting of termination, equipment and number particulars on apparatus cases as instructed by Railway representative at site. (Paints and all other miscellaneous materials required for the work shall be supplied by the Contractor) Note: Item applicable for alterations and maintenance works.
Improvement and upkeep of track structure in Itarsi-Jabalpur section under Senior Divisional Engineer (South) Jurisdiction.
4000.00 plain track below the bottom of the sleepers and surrounding through out its length duly opening two galas on either side of the renewed sleepers and packing the sleeper to bring the track to normal speed including gauging, aligning, squaring of sleepers and sectioning of ballast to the required profile with all contractor's labour, tools and plant etc. including all lead and lift and crossing of tracks where ever necessary complete and as directed by the Engineer-in-charge. Systemic overhauling of track under traffic as per procedure prescribed in latest edition of IRPWM , including removing the crib ballast in 50mm to 75mm depth below bottom of sleeper and complete shoulder ballast without breaking core under the bottom of sleeper, to recover clean ballast by screening on wire mesh and disposing off the muck including throwing & leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms away from the track, as directed by Engineer in-charge including cutting & making up the cess and ensuring proper drainage slope and then re-inserting cleaned ballast into track and compaction of shoulder and crib ballast by wooden mallet and dressing / profiling ballast as per railway specifications.
Electrical TRD portion work involve in construction of extended loop lines at Kedgaon station ,additional loop line at Rukdi & Jaysingpur stations and new stabling line with RBPC at Hadapsar station & Provision of PTFE at various locations of Pune division.
Supply of conventional type OHE along with supply of dropper wire, dropper clips & components (Contact & catenary wire will be supply at Daund/Pune Railway Depot)
JBP- Yard Remodeling - Extension of ARMV siding, ART siding and stabling line no.3 to accommodate full length train
PROJECT for the feeder Railway U/G cable 33KV rail saurabh colony and FEEDER ID 544032
Tab. Biotin 10 mg.
Description :Tab. Biotin 10 mg.(Product should be available in the approved product list of railway board. ) [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] Consignee MEDICAL DIRECTOR /GRC, SER West Bengal 5000.00 Numbers
Liquefied Petroleum gas.
Description :Liquefied Petroleum gas for Industrial application propane based (excluding automobile use ) Type 4.1(c) to IS 4576-1999 Suitable for metal cutting purpose in Railway. Net gas capacity per cylinder 19 Kgs. ] Consignee PWI-CBSA, SER Jharkhand 1750.00 Kg