Loading…
Loading…
2,280 results • Best match
Drain & Pathway works at PNME, NMG, CCK, GMO & MRQ Stations in connection with the work of yard improvement/up-gradation work under ADEN/1/GMO.
72000.00 including disposing of muck beyond Railway boundary as per instructions of Engineer in- charge to keep drains clean and clear in cuttings etc. Total 6904935.04
Zonal Contract (2026-27) for Zone No. 9 under ADEN-Junagadh, Jetalsar (Excl.) to Maliyahatina (Incl.) & Junagadh - Visavadar-Dhari (Incl.) & Visavadar -Talala ( Exl.).
Deputing staff for artisan staff for Masonry Work, Day Plumbing Work, Carpentry Work, welding, brazing of AL work for repairs of taps & flushtanks, pipe lines, replacement of broken window glass, repairs to doors window fittings etc. as per Railway Engineer instructions. (Unskilled labour) Total 3287466.77
Zonal Contract (2026-27) for Zone No. 7 under ADEN-Jetalsar, Bhaktinagar (Excl) - Jetalsar (Incl.)
Deputing staff for artisan staff for Masonary Work, Day Plumbing Work, Carpentary Work, welding, brazing of AL work for repairs of taps & flushtanks, pipe lines, replacement of broken window glass, repairs to doors window fittings etc. as per Railway Engineer instructions. (Unskilled labour) Total 1853689.15
Zonal Contract (2026-27) for Zone No.7-B under ADEN- Jetalsar, "Dhasa( Excl.)- Jetalsar (Excl.)".
Deputing 6 staff for artisan staff for Masonary Work, Day Plumbing Work, Carpentary Work, welding, brazing of AL work for repairs of taps & flushtanks, pipe lines, replacement of broken window glass, repairs to doors window fittings etc. as per Railway Engineer instructions. Total 590115.70
Zonal Contract (2026-27) for Zone No. 6-D under ADEN-Bhavnagar, Work Shop (BG)- Bhavnagar Para all assets inside Workshop boundary wall
Deputing staff for artisan staff for Masonary Work, Day Plumbing Work, Carpentary Work, welding, safaiwala ,brazing of AL work for repairs of taps & flushtanks, pipe lines, replacement of broken window glass, repairs to doors window fittings etc. Safaivala as per Railway Engineer instructions. (Unskilled labour)
OHE modification in connection with the work of improvement of Track Alignment by Track Slewing and OHE modification in CSMT- Kalyan Section of Mumbai Division.
NS-7Dismantling of OHE structures by cutting and transporting to railway depot including loading and unloading