Loading…
Loading…
2,080 results • Best match
Electrical General Services works in connection with Maintenance facility for expansion of Capacity of EMU Carshed at at Kurla Kalva Sanpada of Mumbai Division in Central Railway from 12 coach to 15 coach rake under MUTPIIIA
Supply, erection, testing and commissioning of Design, fabrication, Supply, multiple loading/unloading, storing, installation, fixing, testing & commissioning of factory built (OEM) and assembled Timer Panel Board as per Railway's specification/ requirement for 30/70 or 50/50 lights ofplatform FOBetc. The costalso includesfor all accessories/ GI nut, bolt, hardware, material/painted MS angle, channel/ bracket, HD PVC/Flexible pipe etc.required for fixing/ installation on minimum one foot above the floor level/ wall.
SUPPLY OF PVC INSULATED, ARMOURED, UNSCREENED,UNDERGROUND RAILWAY SIGNALLING CABLE [COPPER CONDUCTOR] SIZE 06 Core X 1.5 Sq mm to RDSO SPECIFICATION No IRS:S:63/2014 (Rev 4.0) or Latest, if any.
Description :SUPPLY OF PVC INSULATED, ARMOURED, UNSCREENED,UNDERGROUND RAILWAY SIGNALLIN G CABLE [COPPER CONDUCTOR] SIZE 06 Core X 1.5 Sq mm to RDSO SPECIFICATION No IRS:S:63/2014 (Rev 4.0) or Latest, if any. [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 2 %age , Item Category : Special (Signaling Cables) , Total PO value varia tion Permitted: Not applicable ] ] Consignee SE/SIG/TIG, ECOR Odisha 3.00 Kilometre UVAM Item ref. ( Item Id :- 3100054 - PVC Insulated Armoured, Unscreened, Underground Railway Signaling Cable , Sub Item Id:-3100054001 - PVC Insulated Armoured, Unscreened, Underground Railway Signaling Cable )
Fabrication, Supply & Repair of Moulds and Modified Stress Benches for Production of Special Type wider base sleepers& T/o Sleepers and Loading, leading & unloading of Railway material for a period of Two years
A-Fabrication, Supply & Repair of Moulds and Modified Stress Benches Above/
Development of all major roads (strengthening, widening, beautification and horticulture work) from PWD rest house to old bus stand including all cross roads form NDRI boundary wall to railway road.(Recall)
[5.1.2]Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : 2. In cement mortar [Through Rate]
Zonal Contract for upkeepment of Metro Rail Bhavan at 33/1 J.L.Nehru Road, Kolkata with water treatment installations, Fire Hydrants, Pipe Line Works etc and Officers Rest House at New Delhi of Metro Railway, Kolkata.
carried out for satisfactory completion as per Metro Railway's Standard Schedule of Rates (Works)- 2016. (Basic Value Rs.29,73,000.00 + Escalation 49.53% = Rs.44,45,526.90) S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit METRO-KOL-HQ-ENGG/METRO RAILWAY Above/ Schedule () D-Non SOR Items 353794.80 Below/P ar
Electrical work for installation & Commissioning of 5 Star AC's for climate control system, Energy efficient as per BEE guideline and replacement of overaged AC at different Railway settlement under Sr.DEE/G/KGP.
Installation And Commissioning of of Air Conditioner Numbers 561.00 2232.00 1252152.00 of BEE 5-star rating, (1.5 Ton-2Ton) (including supply of additional Copper pipe as per IS 10773 : 1995 with latest amendment or specification issued from HQ/GRC if any time to time, connecting copper cable, PVC drain pipe, refrigerent, outdoor mounting stand , nut- bolt , Refrigerant Copper pipe of all size and all other accessories as per site and consignee requirement as per latest IS specification) no extra cost will be paid by Railway if required as per site condition or concerned consignee. PROJECT-KGP-ELECTRICAL/SOUTH EASTERN RLY