Loading…
Loading…
2,091 results • Best match
Provision of 3 phase supply to proposed 2x25 kV TSS at Badnera i.e. (A) Supply & erection of EHV equipments for proposed 3rd phase of TSS-I & II bay at 220 kV Badnera S/Stn under EHV O&M Division, Amravati. (B) Stringing of 3rd phase for existing 220 ... Central Railway to ...
Traction System in Bhusawal division of Central Railway to meet 3000 MT loading target.
TRR (P)- 57.6 TKM and TTR(TWS)-19 sets in Rampur- Lalkuan section under ADEN KPV of IZN division N.E. Railway.
1 in 12 Turnout (Under Traffic Block) Assembling on temporary staging and insertion of all types of turnouts including diamond crossings and derailing switches on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC sleepers with Railways rails/sleepers available anywhere within 500m as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking of turnout with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete in all respect and as directed by Engineer in- charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores.
E-TENDER CUM AUCTION FOR SETTING UP, OPERATION AND MANAGEMENT OF FOOD PLAZA AT B Below CATEGORY OF RAILWAY STATIONS
Cleaning and DPT of specified area of CBC Coupler shank as per RDSO Guideline at NE Railway Mechanical Workshop, Gorakhpur.
RISING MAIN MS PIPE LINE RAILWAY CROSSING AT NWR BKN 2026 WL 405 UNDER JJM UNDER SUB DN. I, BIKANER
Supply laying and pushing of MS casing pipe of specified thickness approved by concerned department authority by trenchless method adopting any suitable technology below ground at required depth under running traffic condition as per Highway/ Railway standard including carrying out survey work at the job site for determining underground cable trenches like telephone, cable, water & sanitary lines and resistivity test for finding the soil strata using necessary equipments for completion of works, mobilizing of machineries and specialized crew at the job site complete in all respect, including excavation of driven pit and exit pit (up to 3 meter depth) with proper protection at these sites with shoring sheets and ISMB. Providing MS cutting edges for front shield and constructing thrust bed at designated level. Necessary dewatering and providing concrete foundation at the base of the driven pit, PVC/Rubber saddle as per the requirement of Highway/Railway authority, crane for handing of pipe and any other machinery, tools, and tackles required, construction of temporary works as per design, drawing and method as per approved by authority specification and the direction of the Engineer. Apply corrosion, resistant, protection on inside and outside of casing pipe as per technical specification. 300 mm Dia 8 mm thick casing pipe.
RISING MAIN MS PIPE LINE RAILWAY CROSSING AT NWR BKN 2026 WL 416 UNDER JJM UNDER SUB DN. I, BIKANER
Supply laying and pushing of MS casing pipe of specified thickness approved by concerned department authority by trenchless method adopting any suitable technology below ground at required depth under running traffic condition as per Highway/ Railway standard including carrying out survey work at the job site for determining underground cable trenches like telephone, cable, water & sanitary lines and resistivity test for finding the soil strata using necessary equipments for completion of works, mobilizing of machineries and specialized crew at the job site complete in all respect, including excavation of driven pit and exit pit (up to 3 meter depth) with proper protection at these sites with shoring sheets and ISMB. Providing MS cutting edges for front shield and constructing thrust bed at designated level. Necessary dewatering and providing concrete foundation at the base of the driven pit, PVC/Rubber saddle as per the requirement of Highway/Railway authority, crane for handing of pipe and any other machinery, tools, and tackles required, construction of temporary works as per design, drawing and method as per approved by authority specification and the direction of the Engineer. Apply corrosion, resistant, protection on inside and outside of casing pipe as per technical specification. 300 mm Dia 8 mm thick casing pipe.