Loading…
Loading…
2,091 results • Best match
Development of Sewerage System in Pendurthi Area Investigation, Construction and Commissioning of 1000mm dia Trunk Main of Railway area, Megadrigedda
S and F of decorative pole and light from Redcross to Railway station and Redcross to Goverdhan Gate, BDA, Bharatpur.
Supplying and drawing FR PVC insulated & unsheathed flexible copper conductor as per PWD specification for electrical Works with ISI marked (IS:694) and as per IS 8130 : 2013 of 1.1 kV grade . Wire should be made from 99.90 % purity copper, class 5 stranding in acc. to IS:8130/IEC 60228 for lower watt loss , oxygen free for less chances of oxidization, insulation PVC type A/C/D , flame retardant as per IS 10810-53, better amperage rating as per IS:3961 part 5, in existing surface or recessed PVC/ MS conduit/casing capping making connections with Copper Lugs of suitable size, Ferrules,testing etc. as required. OEM Must have its own in house NABL lab setup for all testing facilities for wires. For additional technical parameters of product / work refer Annexure 'A' attached with this BSR 2 x 1.5 sq.mm
98.Construction of CC road and slab from Hari Singh Rathore house to toilet near railway crossing in Mohalla Sundarpur.
M.S or Iron work in plain work such as reinforced concrete or R. B. work………all complete.( S I no 504)
Replacement of defective quad cable patch along with Emergency Control circuit, TSS/SP/SSP communication and cable joints in Daund - Wadi section of Solapur division in Central Railway.
1200.00 2.0 Mtr depth along with laying of 120mm HDPE pipe for track crossing with minimum depth reckoned from bottom of the rail/Road crossing with minimum depth reckoned from ground level. The work shall be done as per extant practice & instructions of site engineer. Preparation of site for Horizontal Boring shall be carried out in presence of Railway Representative. HDPE will be supplied by Railway. Note:- Contractor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. SOLAPUR DIVISION-S AND T/CENTRAL RLY
Periodic Overhauling (POH) of different types of Auxiliary Transformer (AT) between Section LJN-GKC & BUW-STP of Lucknow Division N.E. Railway.
Supply of New Transformer Oil. Above/
Construction of cc road from court road pull to vishal mart and railway court road mission compound at ward no. 55
Mild steel work in all work complete (S.I. No. 504)