Loading…
Loading…
2,076 results • Best match
Need based repair on day to day basis by outsourcing for a period of 02 year for Kandivali, Borivali & Dahisar Railway colony.
Deputing 12 staff for Artisan staff(Unskilled Man- labourers) for Masonary work, Plumbing Days work, Carpentry work, welding, brazing of all work for repairs of taps & flush tanks, pipelines, replacement of broken window glass, repairs to door & window fittings, etc as per Railway Engineer instructions.Note:- (1) 12 nos of un-skilled staff is considered. Hence, (365 days) x (2 year) x (12 Man) = 8760 man-days(2) Min. wages rates for area "A" is considered. Total 10577700.00
O M Railway Affecting Tank RAT Reconstruction of Checkdam on Surplus Channel of Mondivagu Anicut Yellamma Kunta Morthad V M Nizamabad District
Replacement (Dropping & Fitment) of Defective striker casting of wagon during POH as per requirement at C&W Workshop, N.F. Railway, New Bongaigaon.
Replacement (Dropping & Fitment) of Defective striker casting of wagon during POH as per requirement at C&W Workshop, N.F. Railway, New Bongaigaon.
P/L of 30mm SDBC on jain palace road Sodal railway crossing to Saipur and Sodal chowk to Punjabi Dhaba chowk (SDRF)
P/L of 30mm SDBC on jain palace road Sodal railway crossing to Saipur and Sodal chowk to Punjabi Dhaba chowk (SDRF) (1 Work)
Construction of RCC culvert and retaining wall at Ganesapuram channel (Connection JJ nagar-Railway gate road) in Ward No.100,South Zone.
Supplying and erecting SHUTTERING including necessary supports for plane surfaces in foundation and in all floors for Vertical wall etc., using mild steel sheets of suitable size and BG 10 stiffened with welded mild steel etc.,
Comprehensive Annual Maintenance Contract of HBL make IPS (27 Nos.) & installed over Lucknow Division of Northern Railway for 36 (Thirty-Six) months.
testing and checking, repair/replacement of various modules/cards/components of Integrated Power Supply system of M/s HBL make mainly consisting of SMR, Inverter, CVT, various DC-DC converters, 230/110V Transformer, auto changeover panel, Battery charger, manual switch, meters, supervisory control unit, fans, SPDs etc. For the period of (Qty. 27 Nos.x 36 = 972 Number-Month.) S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Schedule () B-Repairing of defective Modules of HBL make IPS over LKO Division. 1566415.50