Loading…
Loading…
2,168 results • Best match
Replacement of Existing Composite Insulator (ST, BT & 9T) by Porcelain Insulator Section BBK - CLJ of LJN Division of N.E. Railway
4(ax)(i) Supply of Porcelain insulators (ST & BT) for Each single Bracket assembly.
Replacement of defective quad cable patch along with Emergency Control circuit, TSS/SP/SSP communication and cable joints in Daund - Wadi section of Solapur division in Central Railway.
1200.00 2.0 Mtr depth along with laying of 120mm HDPE pipe for track crossing with minimum depth reckoned from bottom of the rail/Road crossing with minimum depth reckoned from ground level. The work shall be done as per extant practice & instructions of site engineer. Preparation of site for Horizontal Boring shall be carried out in presence of Railway Representative. HDPE will be supplied by Railway. Note:- Contractor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. SOLAPUR DIVISION-S AND T/CENTRAL RLY
Periodic Overhauling (POH) of different types of Auxiliary Transformer (AT) between Section LJN-GKC & BUW-STP of Lucknow Division N.E. Railway.
Supply of New Transformer Oil. Above/
Construction of cc road from court road pull to vishal mart and railway court road mission compound at ward no. 55
Mild steel work in all work complete (S.I. No. 504)
Comprehensive Annual Maintenance Contract of EFFTRONICS make UFSBI system (SSBPAC(D)) installed in Sonpur Division of EC. Railway for 2 years.
Comprehensive Annual Maintenance of Micro processor based SSBPAC(D) Block Instrument with Station Master Block Panel installed in Sonpur divison for two years. Note:-This work involves Comprehensive maintenance, testing, checking, repairing/ replacement of defective 1 modules/ cards/ components/subsystem/part of hardware and peripheral equipments of Block panel & universal fail safe block interface (UFSBI make) installed for one block section. This includes periodic preventive maintenance as well as rectification of all types of failures of the system for the preventive maintenance and failure rectification. All required components pertaining to the system will be supplied and tranported to the site by the contractor. (Note: Unit "Per Station per Month" should be understood as "System-Month") (No of sets/system for AMC= 18 sets )(list is attached at Annexure-A)
Construction of RCC nala and cc road from railway choti line to mal godam and itc gate in ward no.15
mild steel work small size in all work complete