Loading…
Loading…
2,099 results • Best match
Replacement of 33KV overhead conductor with 33KV UG cable with double run using HDD Technique at 4 NOs locations of railway crossing
Supply & Fixing of 33KV metal parts (B & S) as directed by Engr. I/cas per the detailed scope of work & Technical Specifications.
Replacement (Dropping & Fitment) of Defective striker casting of wagon during POH as per requirement at C&W Workshop, N.F. Railway, New Bongaigaon.
Replacement (Dropping & Fitment) of Defective striker casting of wagon during POH as per requirement at C&W Workshop, N.F. Railway, New Bongaigaon.
P/L of 30mm SDBC on jain palace road Sodal railway crossing to Saipur and Sodal chowk to Punjabi Dhaba chowk (SDRF)
P/L of 30mm SDBC on jain palace road Sodal railway crossing to Saipur and Sodal chowk to Punjabi Dhaba chowk (SDRF) (1 Work)
Construction of RCC culvert and retaining wall at Ganesapuram channel (Connection JJ nagar-Railway gate road) in Ward No.100,South Zone.
Supplying and erecting SHUTTERING including necessary supports for plane surfaces in foundation and in all floors for Vertical wall etc., using mild steel sheets of suitable size and BG 10 stiffened with welded mild steel etc.,
Comprehensive Annual Maintenance Contract of HBL make IPS (27 Nos.) & installed over Lucknow Division of Northern Railway for 36 (Thirty-Six) months.
testing and checking, repair/replacement of various modules/cards/components of Integrated Power Supply system of M/s HBL make mainly consisting of SMR, Inverter, CVT, various DC-DC converters, 230/110V Transformer, auto changeover panel, Battery charger, manual switch, meters, supervisory control unit, fans, SPDs etc. For the period of (Qty. 27 Nos.x 36 = 972 Number-Month.) S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Schedule () B-Repairing of defective Modules of HBL make IPS over LKO Division. 1566415.50
Comprehensive Annual Maintenance Contract of AMAR RAJA make IPS (13 Nos.) over Lucknow Division of Northern Railway for 36 (Thirty-Six) months.
Integrated power supply system mainly consisting of SMRs, inverters, CVTs and various DC-DC converter, 230/110V transformers, auto change over panel, manual switch, control unit, fans etc. All required components pertaining to the system will be supplied by the contractor to keep the system in working. For the period of 03 years. Total qty =13 (IPS) X 12(Months) X 3(Years)=468 Number- Months.