Loading…
Loading…
2,170 results • Best match
Comprehensive Annual Maintenance Contract of EFFTRONICS make UFSBI system (SSBPAC(D)) installed in Sonpur Division of EC. Railway for 2 years.
Comprehensive Annual Maintenance of Micro processor based SSBPAC(D) Block Instrument with Station Master Block Panel installed in Sonpur divison for two years. Note:-This work involves Comprehensive maintenance, testing, checking, repairing/ replacement of defective 1 modules/ cards/ components/subsystem/part of hardware and peripheral equipments of Block panel & universal fail safe block interface (UFSBI make) installed for one block section. This includes periodic preventive maintenance as well as rectification of all types of failures of the system for the preventive maintenance and failure rectification. All required components pertaining to the system will be supplied and tranported to the site by the contractor. (Note: Unit "Per Station per Month" should be understood as "System-Month") (No of sets/system for AMC= 18 sets )(list is attached at Annexure-A)
Construction of RCC nala and cc road from railway choti line to mal godam and itc gate in ward no.15
mild steel work small size in all work complete
Construction of Roof At Dr. Bheem Rao Ambedkar Statue in ShivKatra and Railway Line Kachi Basti Patel Nagar ward-26 Zone02
Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr.
Construction of Roof At Dr. Bheem Rao Ambedkar Statue in ShivKatra and Railway Line Kachi Basti Patel Nagar ward-26 Zone02
Reinforcement Cement Concrete work in 1:1.5:3 grade excluding cost of centering, shuttering and finishing for Column work.
Gonda Utraula Marg par Railway Over Bridge Dayee Taraf 01 Adad 16 Mtr Pole par High Mast Light ke Sthapana Karya
Supply and wiring of submains with 2 nos. 2.5sqm & with 1 no earth wire of 1.5 sq mm FRLSH PVC insulated 1100 V grade single core multistrand copper conductor cable in existing PVC conduit complete, inclduing supply of all material, labour and T&P etc required for proper completion of the work as directed by Engineer in charge.Same as in item 291 but with 3 nos 4sqmm and 2 nos 2.5 sqmm FRLSH PVC insulated copper conductor cable Schedule 2018 SI No 291B
Constructon of Road Over Bridge (ROB) in (Railway Porton) in lieu of LC No. 0/B at 67/0-1 Km between Mau - Indara Railway statons in Bhatani-Varanasi secton with steel girder. Constructon of Road Over Bridge (ROB) in (Railway Porton) in lieu of 12 ... E. Railway .
Fabrication, transportation, supplying and MT stacking at bridge site of welded type steel cammel back girders of 1X60 m span as per RDSO Drg. No. RDSO/B-10444 series(with latest alteration) for construction of ROB at LC No. 19 Spl at Km. 33/5-6, Paschim cabin, Madhuban Dhala at Belthara Road Railway Station as per RDSO's approved latest drawing & as per specifications and LC No.0/B km. 67/0-1 Mau yard Bow String girders span 1x42 m RDSO Drg.No. RDSO/B- 10437 and composit girders for 1x30 m span RDSO Drg.no. RDSO/B-11779, for LC. No.12 KM 148/3-4 NDJ Yard Bow string girders span 1x60 m RDSO Drg.No.RDSO/B-10434 as per RDSO approved latest Drg. complete with bearings POT PTFE type/ elastomeric bearing & guided bearings and supply of HSFG Bolts/ Turn bolts, nut, washers required to assemble the girders at site with contractor's own steel labour, tools, plants, temporary arrangements and all consumable stores required for the work, transporting the girders to site, unloading and stacking the girders at the bridge site. The rate is inclusive of cost of fabrication & supply of POT PTFE/ elastomeric bearing & guided bearings. All the material in fabrication viz steel, PTFE, elestomeric, etc. to be used in fabrication of girder shall be as per Railway's approved drawing & specifications. CAO-C-RSP-NER-ENGINEERING/NORTH EASTERN RLY