Loading…
Loading…
6,281 results • Best match
Sampark marg gram sabha tarya sujan (paschim tola) me railway dhala se gram sabha patharawa pitch road tak nirman karya
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%
Construction of P.C.C Road at Village Kelende from Babuli Sawaiyan House to Railway Fatk at Panchayat-Kelende in block-Jhinkpani
Strengthening of Steel Roof Truss Structure at Bagging Plant Railway Siding Area in FACT CD, Ambalamedu, as per tender conditions.
Supplying, Conveying, fabrication and erection of structural steel work bolted or welded at all levels as per scope drawing for trusses, purlins, louver brackets, louver runners bracings, stair cases, platforms, hand rails ladder, threaded sag rods, splices, etc. with M.S angles, channels, tees, flats, RSJs, rods, pipes and plates including cutting, welding, cleaning, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts.(The structural steel material shall be of M/s. SAIL / RINL / TISCO /JINDAL make) - Required gas and electrodes will be supplied free of cost by FACT at stores
Construction of road and drain from h/o hari singh to railway line in ward no 01 in mc hodal
[6.34.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
WARD NO. 13 MOH. KRISHNAPURI ME RAILWAY FATAK KE PAAS SE BAMBE KE PUL TAK R.C.C. ROAD KA NIRMAN KARY
R.C.C. Work with cement approved coarse sand and 2 cm. gauge approve stone grit in proportions of 1:2:4 in Light beam having spans upto 6M excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary, centering & shuttering etc. and supply of all material, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.
PROVIDING 2 STORM WATER DISPOSALS and LAYING THE STORM WATER PIPE LINE AT RAILWAY ROAD and AGWANPUR ROAD DISTRICT SONIPAT.
Taking out field data / Preparation of estimate for storm water Ganaur town, Hydraulic design of rising main lines. Working out BOQ and Uploading at HEW Portal including working out quantities of each structure as per HSR. Preparation of Lay out plan and detailed drawings of various proposed structures complete in all respect. Supply of 3 colored set of each drawings and estimate.