Loading…
Loading…
6,591 results • Best match
Set of 35 mm Non Asbestos based organic brake pads for LHB coaches (one left hand and one right hand) conforming to RDSO specification number RDSO/2013/CG- 01 (Rev.3)
... Asbestos Based Organi c Brake Pad for LHB Coaches equipped with disc brake system on Indian Railways to RDSO spec. RDSO/201 3/CG-01 (Rev.3) [ Warranty Period: 24 Months after the date of... based organic brake pads for LHB type coaches equipped with disc brake system on Indian Railway to RDSO spec RDSO/2013/CG-01 (Rev.3) ) Inspection Details Stage Inspection Not Required
Bench Vice (Q3), Machine Vice as per IS 4502 (Q3), Pipe Vice as per IS 2587 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ... Indian Railway s, ... of Railway s, ...
All in One PC (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization ... Indian Railway s, ... of Railway s
Indian Railways
Revision of Architectural Control Sheet of Sector 34-A and B, Chandigarh (Conducting Detailed Topographical Survey Of Sector 34-A and 34-B, Chandigarh).
... trees, pucса & kutcha nallas, ditches, (with or without water), nearby roads / approaches, railway track, culverts, overhead transmission & communication lines, ridges, boundary wall, fencing,... clearing of jungles & debris and cutting of trees (to the minimum extent as required for the work and as per instruction of the owner) etc. complete in all respects to the entire satisfaction ...
Construction of Storm Water Drains and Remodling of the existing Storm Water Drains for Storm Water Drainage System in NUH Town District NUH.
... thickness of 250 micron for protection against corrosion complete in all respect under Railway track including cartage of material to site of work and testing complete in all respect as per satisfaction of Engineer-in-Charge
Shifting of 90mm / 63mm dia PVC pipeline at Ghanemorad in V.P Xeldem in Curchorem Constituency.
Supplying at store or site of work including railway freight carting loading unloading stacking etc. C. I. single large orifice air valve(... S2)confirming to IS 14848/2000 with suitable connections as directed by Engineer -In- Charge for working pressure of 16kg/sq.cm. (Class A);Supplying at store or site of work including railway freight carting loading unloading stacking etc. cast iron single orifice type Air( fig ...