Loading…
Loading…
6,611 results • Best match
Extension of 100mm dia DI pipeline at Bormolem in Village Panchayat Barcem-Quedem of Quepem constituency.
Supplying at store or site of work including railway freight carting loading and unloading stacking etc. Centrifugally cast (spun) ductile iron pressure pipes (with socket/spigot ends) conforming to IS : 8329-2000 with cement mortar lining inside the pipe and outside zinc coat as per IS : 8329-2000 with up to date amendments suitable for jointing with rubber gasket known as TYTON joints. Class K-9 .
POH Kit for C3W Distributor Valve etc.
... Distributor Valve with Relay Valve for air brake system of Passenger stock on Indian railways to Spec. No. C-K209 , Sub Item Id:-
Maintenance Contract for execution of P.Way Works at Oil Loop Line, Dumper Cabin etc. and Western Sector for a period of two years i.e. 2025 to 2027 Rly Zone II.
Alumino Thermic Welding Works for 60 Kg/60 EI - R 260 grade Rail, 25mm gap 'in-situ' welding during traffic block and... with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" ...
Construction of 33 KV KAGAROL Line in Agra district on semi turnkey basis
Laying of H.D.P.E. Pipe underground below the Railway Track/Highway/Road or as per drawing approved by Railway/Highway/Road by HDD Method along with laying of 33 KV, 3x300 Sq. mm. XLPE Cable in H.D.P.E. Pipe
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6902491 Dated : 19-11-2025 Bid Document 1/14 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 455000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Urgent supply and fixing of 450 mm dia cast steel sluice valve of backwash tank at 40 MLD Water Treatment Plant at Podocem
Supplying at store or site of work including railway freight carting loading unloading stacking etc. Cast steel double flanged manually operated ...