Loading…
Loading…
6,081 results • Best match
Supply of P-way materials for Maintenance of Railway Track (52 Kg./ meter Rail) from Bir Railway Station to Plant at SSTPP, Dongalia Distt. Khandwa.
Complete track renewal of Railway siding at FSD Gorakhpur
eProcurement System Government of India Created By: Prateek Kesharwani Created Date/Time: 26-May-2026 02:56 PM Tender Title: Complete track renewal of Railway siding at FSD Gorakhpur Tender ID: 2026_FCI_900885_2
LUBRICANT IS 1118-92- 2006 API-GL-4, BALMEROL PROTOMACH H - 100 OF, GOLD PREMIUM CI4 15W40, OIL HYDRAULIC TO IS 10522-83 2004 ANTIWEAR, MULTIGRADE OIL SERVO RR - 606 MG PLUS II, PROTOMAC ULT 10W OF, ULTRA 10, PROTOMACH C4 SAE30, CI4 PLUS 15 W 40 LUBRICANTION OIL SERVOPRIDE SUPERM, BLUE COAT 2 HYTAK 2, GREASE SIMILAR TO PLASSER PART NO GADUS S2 V100 2
lubricants for maintenance of Railway track machines
214/26-MANIKKOTH RAILWAY TRACK ROAD IMPROVEMENTS
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Complete Track renewal of Railway Siding at FSD Roza
Fabrication including cutting, bending / machining and fixing of check rails of all rail sections over PSC Sleepers as per Railway’s approved drawings & specifications for level crossings / trolley paths / inspection lines in yards duly cutting rail flanges, wherever required to correct alignment and level, drilling of holes with machine in check rails and fixing to Running rail and sleepers with all Railway's fittings, e.g. rail screws / grip expansion bolts, brackets, packing pieces, bolts, washers etc including grinding of brackets if required, fixing of Railway's wooden blocks at flare ends duly cutting and plaining, crossing of tracks and as directed by the engineer in-charge Note: 1.Drilling of holes in PSC Sleeper and fixing of dowels shall be paid under relevant item. 2. Required P.Way materials will be supplied at SSE/P.Way stores
A/mtc. of Railway under bridge at Mewla Maharajpur Railway Crossing Sector-45 and 46 Faridabad. Providing and fixing of Steel gate RUB Sector-45 Faridabad and all other works contingent thereto. (Balance Work)
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works