Loading…
Loading…
16,683 results • Best match
Composite work for Execution of earthwork in Formation & Cutting, Construction of Minor Bridges, New Platform, Extension of FOB, P.Way Track Linking Works, supply of Ballast, EI Building, other service Buildings, Approach Road, side drains, ... Protection works , ... Remodeling works at ... electrical works as ... S.E. Railway .
Erection of overhead equipment, including Per Track catenary (Railway Supply), contact (Railway KM Supply), jumper and dropper wires.
Composite work for Execution of earthwork in Formation & Cutting, Construction of Minor Bridges, New Platform, Extension of FOB, P.Way Track Linking Works, supply of Ballast, EI Building, other service Buildings, Approach Road, side drains, ... Protection works , ... Remodeling works at ... electrical works as ... S.E. Railway .
Erection of overhead equipment, including Per Track catenary (Railway Supply), contact (Railway KM Supply), jumper and dropper wires.
Zonal contract for all general work, wood works, road works, pipe line & sanitary work at Danapur for all service building on south side of railway track and DRM building, Hospital & Rest house etc. under ADEN/HQ/DNR of Zone No.6/2026-27.
Annual Maintenance Contract for supply of spare parts for carrying out checking, repairing/maintenance of Kershaw make BRM-120 Track machine working over South East Central Railway.
Provision of EI buildings & associated civil and track works at Kasganj yard in connection with Etah-Kasganj New Line Project in Izatnagar Division of North Eastern Railway.
... plans may be provided by railway or specifications/requirements... soil test reports by the railway in case this is nor done... per latest guidelines of railways/instruction of engineer ...
Road construction work by CC on the side track of the damaged drain from Ward No. 27 Rajputana Square to near the railway line.
... Rajputana Square to near the railway line. Tender ID: 2026_DOLBU_1148317_210
Supply, erection, testing & commissioning of 25KV OHE Leftover electrification and modification works at HTE-Yard including RC & PSI works and General Services work in connection with the Doubling work between Ranchi (Hatia) and Bondamunda in Ranchi ... Eastern Railway .
Erection of overhead equipment, including Per Track catenary (Railway Supply), contact (Railway KM Supply), jumper and dropper wires.
Routine railway track maintenance of railway siding of NCPH colliery in Chirimiri Area.
Maintenance of private railway siding as per indian railway specification including ...
Electrical work in connection with Development of Goods Infrastructures as per Handling of Commodity at Chilwariya Railway Station & Augmentation of Power supply by replacement of overhead line by underground cables at BRK & NNP Railway colony.
Carting of Material from Railway site supervisor's depot to site (Only for the material supplied by Railway and returning of Released material from site to store depot of Supervisor)
Construction of Platforms, Good Shed, Earthwork/ blanketing in formation/cutting, Retaining Wall & Drain, COP &, FOB extension, Bridge (Br. No.371/3,371-4,372- 1,373-1,373-2,374-1,374-2,374-3,375-1), Object controller Building, etc. work and ... and Track Works for ... Ballast Supply in ... Central Railway .(Two
... will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the... and to be deposited in the railway godown unless specified otherwise ...