Loading…
Loading…
273 results • Best match
Outsourcing of Labour Part of LT/HT Network Safety Compliance and System Strengthening Project by upgrading the LT/HT distribution infrastructure to ensure full compliance with statutory safety clearances as mandated.
Outsourcing of Labour for systematic beautification, rectification, safety compliance and system strengthening of low-lying LT and associated 11 kV distribution network under East Division Amritsar under DS Suburban Circle Amritsar
Hiring of Consultants - Milestone/Deliverable Based - TEV for Development and Operation of the City Gas Distribution network in the Bikaner and Churu Geographical Area (GA) of Rajasthan; Subject Matter Expert; No; Hybrid(As specified in scope of work..
... Operation of the City Gas Distribution network in the Bikaner and Churu ...
DEPOSIT Improvement of the water supply distribution network in Jagathy Ward for ensuring reliable water supply by means of replacement laying and necessary alterations of existing and newly proposed pipelines Pipeline work
REPAIR AND MAINTENANCE OF HT/LT DISTRIBUTION NETWORK INCLUDING BUSBAR DUCT TRUNKING AND ALLIED WORKS AT DSS 5, DSS 5A AND DSS12 INCLUDING SHORE SUPPLY AT SITE A2 OF NAVAL BASE KARWAR
MEGALIFT PROJECT
... of Sonepur including its distribution network, up to 1 Ha Chak having... from the Local/Identified Grid Substations, and commissioning of all ...
Stringing High Tension 33kV Covered conductor , shifting and modification of the existing 11 kV, and Low Tension (LT) electrical distribution network for facilitating the Kannanalloor Town Development Project funded by Kerala Infrastructure Investme
Annual maintenance of Pedong Water Supply Scheme contain 22 KM Rising main and distribution network Retrofitting for FHTC lmprovement of piped water supply scheme for Pedong Bazar adjoining areas in connection with for the period of 365 Days Un
... contain 22 KM Rising main and distribution network & Retrofitting for FHTC ...
The project includes the repair of the VCB, construction of protection walls and shutters, construction of a pump house and implementation of a new water distribution system for irrigation.An HDPE pipeline network has been included.
Surveying, Soil investigation, Design, Supply of all Materials etc. Required for construction of Over Head Tanks, , SCADA Automation of all OHT, Rising Main, Distribution Network, House connection, Boundary wall, MS gate, site development work