Loading…
Loading…
1,541 results • Best match
Deployment of manpower for operation of scheme for Six Months
Deployment of skilled/ un-skilled man power for Operation & maintenance of pumping machinery, rising main and distribution network storage tank etc. including watch & ward of pumping machinery,all civil structures such as pump house, water storage tank, sump well and maintenance of ornametal plants, lawns and flower beds etc. as per direction of the Engineer-in-Charge. SCOPE:- Civil Works - 8 Nos Pump House, 5 Nos Sump well, 2 Nos Slow sand treatment unit (Raw water tank, sedimentation tank, Filter Bed & clean water tank), 6 Nos silt tank, 7 Nos Main Storage tanks & 6 Nos. Sub Storage tank. Rising Main:- 65 mm dia= 1800 Rmts, 150 mm Dia= 3900 Rmts, 80 mm dia= 2399 Rmts, 100 mm dia= 2600 Rmts. Distribution System:- 36550 Rmt various dia 15 mm to 200 mm dia. Pumping Machinery :- Booster stage 2x40= 80 HP, 2x60= 120 HP,2x12.50= 25 HP, Main Stages 1x65= 65 HP, 2x60= 120 HP, 2x120= 240 HP, 2x100= 200 HP, 2x20= 40 HP, 2x40= 80 HP, 2x170=340 HP. Man Power to be Deployed:- (1) Pump Attendant:- 4 Nos ( For operating the Pumping Machinery). (2) Helper/ Beldar= 3 Nos. ( For operating the scheme). (3) Chowkidar = 1 No. ( For Office). Total : 8 Nos.
Deployment of manpower for operation of scheme for Six Months
Deployment of skilled/ un-skilled man power for Operation & maintenance of pumping machinery, rising main and distribution network storage tank etc. including watch & ward of pumping machinery,all civil structures such as pump house, water storage tank, sump well and maintenance of ornametal plants, lawns and flower beds etc. as per direction of the Engineer-in-Charge. SCOPE:- Civil Works - 2 Nos Pump House, 2 Nos Sump well, 1 No.Slow sand treatment unit (Raw water tank, sedimentation tank, Filter Bed & clean water tank), 4 Nos Main Storage tanks & 8 Nos. Sub Storage tank. Rising main:- 125 mm dia= 2430 Rmts, 100 mm Dia= 2590 Rmts, 50 mm dia= 1820 Rmts. Distribution System:- 99256 Rmt various dia 15 mm to 100 mm dia. Pumping Machinery :-Booster stage 2x7.5= 15 HP, 2x12.5= 25 HP, Main Stages 1x65= 65 HP, 2x60= 120 HP, 2x120= 240 HP, 2x120=240 HP, 2x30= 60 HP, 2x20= 40 HP, 2x10=20 HP, 2x45= 90 HP. Man Power to be Deployed:- (1) Para Fitter = 2 Nos. ( For maintain the Rising main, Gravity main and Distribution System). (2) Assistant Pump Attendant:- 3 Nos (For operating the Pumping Machinery). (3) Helper/ Beldar= 3 Nos. ( For operating the scheme). Total : 8 Nos.
Deployment of manpower for operation of scheme for Six Months
Deployment of skilled/ un-skilled man power for Operation & maintenance of pumping machinery, rising main and distribution network storage tank etc. including watch & ward of pumping machinery,all civil structures such as pump house, water storage tank, sump well and maintenance of ornametal plants, lawns and flower beds etc. as per direction of the Engineer-in-Charge. SCOPE:- Civil Works - 6 Nos Pump House, 6 Nos Sump well, 1 No. Slow sand treatment unit (Raw water tank, sedimentation tank, Filter Bed & clean water tank), 1 No. 1.58 WTP (Rapid sand), 7 Nos Main Storage tanks & 15 Nos. Sub Storage tank. Rising main:- 65 mm dia= 3800 Rmts, 150 mm Dia= 3900 Rmts, 80 mm dia= 1300 Rmts. Distribution System:- 125330 Rmt various dia 15 mm to 150 mm dia. Pumping Machinery :- Booster stage 2x40= 80 HP, 2x60= 120 HP, 2x12.50= 25 HP, Main Stages 1x65= 65 HP, 2x60= 120 HP, 2x120= 240 HP, 2x100=200 HP, 2x30= 60 HP, 2x40= 80 HP. Man Power to be Deployed:- (1) Fitter = 1 No. ( For maintain the Rising main, Gravity main and Distribution System). (2) Pump Attendant:- 4 Nos (For operating the Pumping Machinery). (3) Helper/ Beldar= 3 Nos. ( For operating the scheme). Total : 8 Nos.
NIT 89/2025-26
Maintenance of pipelines irrespective of size & material which includes Repairing of Sursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection&recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution/rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excvated tench /pit/road shall be done properly i.e. after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T&P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and resttore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department.
Nit 46 Work of maintenance of various sizes pipe line and timely valve operation in Kekri City under Sub Division Kekri Division Kekri
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakage pollution control, survey & removal of choking, disconnection of illegal connections, collection & recording minimum 10 nos. residual chlorine samples during daily supply timing, interconnections and all work related to pipeline network in existing distribution main pipelines of all sizes by digging out of suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. contractor with his own resources shall arrange dewatering, JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakage within stipulated time and complete maintenance of distribution pipeline network within the scope of work for per KM pipeline per month. Jointing material shall be provided by the department.
NIT-146-2025-26
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department.