Loading…
Loading…
1,542 results • Best match
Operation and Maintenace for one year of various sizes of pipe lines AC and uPVC of Regional Water Supply Scheme Jamba-Ghantiyali-Boongari and Aau-Moriya-Champasar originating on annual rate contract
7.1 - Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department. Minimum labour for a following kms pipelines to be deployed. 1 km to 50 km - one fitter-II & one beldar 51 km to 100 km - one fitter-II & Two beldar 101 km to 200 km - Two fitter-II & Four beldar 201km to 300 km - Three fitter-II & Six beldar 301 km to 400 km - Four fitter-II & Eight beldar 401 km to 500 km - Five fitter-II & Ten beldar (177.70 Km. x 12 Month = 2132.4 )
The Work Of Repair and Preventive Maintenance of pipeline ( Leakages and pollution control), Interconnection Under Sector 9 Maviya Nagar chowki jurisdiction of City Sub Dn-VI (South) Jaipur
Maintenance of pipelines irrespective of size & mateiral which includes repairing of bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, collection & recording minimum 10 nos. residula chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution/rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/hard soil including cutting of Black top, WBM & CC top of orad of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing mateiral to make repair leak proof and refilling of pit by excavate4d sand by ramming it at sides of pipes and upto ground level for entire job contractor will use their own T & P. Conractor with his own resources shall arrange de-watering. JCB & Tractor compressor if any and restore any amentity at his own cost damaged while performing the work in this time. The work includes daily patrolling and repair the leakages withing sipulated time and complete maintenance of pipe line network of rising and distribution pipeline network withing the scope of work for per km. pipe line per month. Jointing material shall be provided by the department
NIT 21 Repair and Maintenance of all types and sizes of pipeline under City Sub Division-IX N , Mistrikhana, Urban water supply scheme, Jaipur
Maintenance of distribution/ rising/transfer main pipeline. Maintenance of pipeline irrespective of size & material which includes repairing of Bursts & leakages pollution control, survey & removing of choking, disconnection of illegal connections, collection & recording minimum 10 Nos. residual chlorine samples during supply timings, interconnections and all works related to pipeline network in existing distribution / rising main pipeline of all sizes by digging out suitable size pit in soft and loose soil/hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T&P. Contractor with his own resources shall arrange de-watering , JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department.
Operation and maintenance of WSS of Madrampura sector 35 Sub Div II(S) under jurisdiction of city div IV (S) PHED Jaipur for 6 Month.
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. 34 km/month Jointing material shall be provided by the department. (34 km) Minimum labour for a following kms pipelines to be deployed. 51 km to 100 km - one fitter-II & Two beldar (34 X 6)
Appointment of Proof Engineering Consultant (PEC) for Construction of Distribution system for 5177.98 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 59.970 km to 60.304 km through UGPL.
2 Follow-up and vetting of Re-engineering works required to be done by EPC contractor for actual site condition for distribution network and CAD & WM works for 5177.98 Ha and micro irrigation for 1216 Ha of Salandi Left Main Canal from RD 59.970 km to 60.304 km. code1.02 1 Nos 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
A/R and M/O source level augmentation of various LWSS /WSS under Sadar Ghumarwin and Jhandutta Blocks from Koldam in Tehsil Sadar District Bilaspur (SH Operation of pumping machinery and distribution system of water supply from main storage tanks to
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSSKol Dam whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.