Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.1 LAccepted-AOC 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | ₹18.1 L Quoted ₹23.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹24 LRejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | ₹24 L | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Manoj Kumar L2 | Pawan Kumar L1 |
|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSSKol Dam whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 24,00,000 ₹24 L | 23,90,000 ₹23.9 L |
| 2.00Description of main components of the scheme is as under:- | |||||
| 2.01Civil works: 3 Nos pump house, Rising main: 1st stage: 450mm dia 1485 Rmt, 2nd stage 450mm dia=2700 Rmt, 3rd stage 250mm dia =3270 Rmt. Pumping machinery:1st stage 9x240=2160 HP, 2nd stage 9x220=1980HP,3rd stage 6x200=1200 HP Distribution system: 350Km No of storage tanks: 2 Nos main storage tank, Total working hours: 72 through , 12 Nos persons. Indicators to be mentioned:No of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: (6300000 Litr). Pumping hours per day (12) and energy consumptoin per day Unit. | |||||
Tender Value
₹19.2 L
EMD Value
₹38,310
Closing Date
7 Jan 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O source level augmentation of various LWSS /WSS under Sadar Ghumarwin and Jhandutta Blocks from Koldam in Tehsil Sadar District Bilaspur (SH Operation of pumping machinery and distribution system of water supply from main storage tanks to
2025_HPIPH_124515_2
BLP-BLP-0736-NIT No. 10859-10958 Dated 26/12/2025
Open Tender
Civil Works
365 days
Sub Division Kandrour Section Salnoo
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
EE JSV Bilaspur
₹38,310
1 Apr 2026
29 Dec 2025
7 Jan 2026
29 Dec 2025
7 Jan 2026
29 Dec 2025
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSSKol Dam whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 3 Nos pump house, Rising main: 1st stage: 450mm dia 1485 Rmt, 2nd stage 450mm dia=2700 Rmt, 3rd stage 250mm dia =3270 Rmt. Pumping machinery:1st stage 9x240=2160 HP, 2nd stage 9x220=1980HP,3rd stage 6x200=1200 HP Distribution system: 350Km No of storage tanks: 2 Nos main storage tank, Total working hours: 72 through , 12 Nos persons. Indicators to be mentioned:No of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: (6300000 Litr). Pumping hours per day (12) and energy consumptoin per day Unit.
Manoj Kumar (BID ID -605856)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
PWD8.pdf
Tender Documents • 1.32 MB
Termsandconditions.pdf
Tender Documents • 0.35 MB
PWD6.pdf
Tender Documents • 0.40 MB
BOQ_183025.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid