Loading…
Loading…
1,549 results • Best match
Work of Operation and Maintenance of RWSS Modi under jurisdication of PHED Sub. Dn. Mundwa under PHED Dn., Nagaur
Maintenance of pipe line irrespective of size & material which includes repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 Nos. residual chlorine samples during daily supply timings, inter connections and all works related to to pipe line network in existing distribution / rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil / hard soil including cutttop , WBM & CC top of road of any size at work site. this will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T&P. Contractor with his own resources shall arrange dewatering. ICB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipe line network within the scope of work for per Km. pipe line per month jointing material shall be provided by the department pipe line AC/ PVC / HDPE/ DI
AMC work of 132/33 kV GSS, Chakradharpur for the period from 01.06.2026 to 31.03.2027 i.e. 304 days
Maintenance / Emergency Maintenance of Grid Substation as per schedule and JOB provided by Engineer In-charge.
AMC work of 132/33 kV GSS, Chaibasa-II (Sikursai) for the period from 01.06.2026 to 31.03.2027 i.e. 304 days
Maintenance / Emergency Maintenance of Grid Substation as per schedule and JOB provided by Engineer In-charge.
Supply, Installation and Commissioning of 01 No. G plus 2, 08 passenger Elevator at Marine side of Administrative Building, PPA.
Supply, Installation, Testing & Commissioning of 08 Passenger G + 2 Elevator including support structural, enclosures etc. complete with required civil & electrical works on turnkey basis as per Scope of Work.
Installation of a pipeline for drinking water supply from Gawendra house to Imran Tailor house, a distance of 155 meters in Ramnagar neighborhood.
supply of all materials, labourT&P etc. All complete and inter- connection exixting system with the proper distribution network at various points
Work of pipeline for drinking water supply from Mohar Singh house to Jahaveer Baba Ji temple in Mohalla Ambedkar Nagar for a distance of 320 meters.
supply of all materials, labourT&P etc. All complete and inter- connection exixting system with the proper distribution network at various points