Loading…
Loading…
10,060 results • Best match
Engagement of Consultant for RoW (Right of way) along with junction improvement on roads I NIT Area, Faridabad and all other works contingent thereto
Financial offer for Engagement of Consultant for developent of RoW (Right of way) along with junction improvement on roads I NIT Area, Faridabad within te jurisdiction of te Faridabad Metropolitan Developet Atorit (FMDA) o Quality Cost Based Selection (OCBS).
Providing GI water supply pipelines in various cross roads in 14th Division in Works Division-3 area. 3rd Call General Funds
Improvement such as widening and strengthening of Godbhaga to Turum (SH-54) road from 20/000 Km to 39/917 km in the district of Bargarh under State Plan
Earth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in... including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, ...
Improvement of Hatadihi-Samana via Jambhira Habaleswar road from 0/000 km to 5/900 km, 9/000 km to 11/200 km and from 14/000 km to 19/600 km in the district of Keonjhar under State Plan
Unit Cum Earth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in... including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, ...
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
Road/Bridge Work
Construction of Road Over Bridge with 1 x 24.0 m composite girder (Sanakastulli side) + 1 x 42.0 m composite girder (Railway span) + 1 x 24.0 m composite girder in Railway portion at Km 592/16-18 in lieu of LC No. 302, and proposed span of 4 x 24.0 m ... Khurda Road Division.
Item Breakup - A-Execution of Bridge and approach Sub-Structure Works with service road