Loading…
Loading…
11,224 results • Best match
CONSTRUCTION OF CC DRAIN WORK AT ATER ROAD YOGENDRA SINGHT OMAR HOUSE TO BYPASS TIRAHA MUNICIPAL COUNCIL PORSA DIST MORENA
CONSTRUCTION OF CC DRAIN WORK AT ATER ROAD YOGENDRA SINGHT OMAR HOUSE TO BYPASS TIRAHA MUNICIPAL COUNCIL PORSA DIST MORENA
Construction of Proposed Livelihood College Building I/C. Water Supply, Sanitary Fittings, Boundary Wall, approach Road & Electrification Works at Durg Distt-Durg (C.G.)
FOR Construction of Proposed Livelihood College Building I/C. Water Supply, Sanitary Fittings, Boundary Wall, approach Road & Electrification Works at Durg Distt-Durg (C.G.)
CONSTRUCTION OF RCC DRAIN NH ARABHAVI CHALLAKERE HIGHWAY LEFT SIDE OF KURLGERI ROAD IN NARAGUND TOWN
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
(EPC) MODE CONSTRUCTION OF BRIDGE OVER RIVER SUKHNAI BETWEEN KATERA RANIPUR (PATHGUVAN), APPROACH ROAD AND PROTECTION WORK IN DISTT JHANSI
ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC) MODE CONSTRUCTION OF BRIDGE OVER RIVER SUKHNAI BETWEEN KATERA RANIPUR (PATHGUVAN), APPROACH ROAD AND PROTECTION WORK IN DISTT JHANSI
Construction of Safety Wall, Gate and other related works from Sector No.1 Gandhare Road to Municipal Reservation no.39, Kalyan (W)
Construction of Bagbeda to Gamhari Road inc Bridge & Culverts Length 5.00 Km Work Code W29759 Dist Kondagaon
Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia., across the road ( new construction ) , extending from drain to drain in cuts and toe of slopes to toe of slopes in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipes as per IRC: 98- 2011, bedded on a 0.3 m thick layer of granular material free of rock pieces , outer to outer distance of pipes at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts , joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC:98-2011 and approved drawings. (i) Single row for one utility service