Loading…
Loading…
10,331 results • Best match
Please Refer to BOQ.
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, ...
Construction of CC roads and drains in Ward No. 25 (Maninath) from Kirans house to Vipins house from Bajravati to Ravis house from Rakhis house to Shalini Sonkars from Ranjeet Ranas to Rambahadurs and from Virendra Pathaks via Om Prakash Sharmas to t
Dismantling of old damage BOE C.C. tiles Road work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M
Periodical Maintenance to Bhalukhai to Banmal road for the year 2026-27
... bituminous binder of 60/70 penitration grade of bitumen, transporting the hot mix to work site, laying with hydrostaic paver finisher with sensor control to the required grade,... tandem roller to the desired compaction as per clause 508 of MoSRT&H specification for road and bridge works etc.complete as per direction of EIC.
Periodical Maintenance to Khuripani to Jamunapali for the year 2026-27
... bituminous binder of 60/70 penitration grade of bitumen, transporting the hot mix to work site, laying with hydrostaic paver finisher with sensor control to the required grade,... tandem roller to the desired compaction as per clause 508 of MoSRT&H specification for road and bridge works etc.complete as per direction of EIC.
Periodical Maintenance to PWD road to Parlimal for the year 2026-27
... bituminous binder of 60/70 penitration grade of bitumen, transporting the hot mix to work site, laying with hydrostaic paver finisher with sensor control to the required grade,... tandem roller to the desired compaction as per clause 508 of MoSRT&H specification for road and bridge works etc.complete as per direction of EIC.
Periodical Maintenance to Tikrapada RD Road to Dukelcharchar for the year 2026-27
... bituminous binder of 60/70 penitration grade of bitumen, transporting the hot mix to work site, laying with hydrostaic paver finisher with sensor control to the required grade,... tandem roller to the desired compaction as per clause 508 of MoSRT&H specification for road and bridge works etc.complete as per direction of EIC.