Loading…
Loading…
11,006 results • Best match
Providing road lighting works from Dhimrapur Chowk To Kotara Thana Chowk at Raigarh Block, District Raigarh (C.G.)
C/o 6 Nos Double Lane Bridges and ancillary works on Itanagar-Jotte Road (CMCSRDP-II) (4 Nos Bridges)
Supply and installation of 0.17 m thick mattress made of mechanically woven, double twisted, hexogonal shaped steel wire mesh, Mesh type 6x8 as per IS: 16014 : 2018, Mesh wire dia 2.2/ 3.2 mm (ID/OD) with pleated diaphram and prefabricated vertical ties, (Zn 90%-AI 10%)+ High Abrasion resistance polimer coated dark rown rust not more than 5% after subjecting to 10000 hours of neutral salt spray as per ISO : 9227 and polimer should be resistant to abrasion after 300 cycles and shall not expose metal wire. The third party testing for arasion testing of polymer coating on mesh must be accredited and verified b the Indian Institute of Technology, Bombay (IIT Bombay) in strict accordance with the procedure outlined in ASTM A975, Mechanically edged/selvedged with pleaed partition at 1 m interval with prefabricated vertical ties, lying with lacing wire of diameter 2.2/3.2 mm (ID/OD), placing at indicated places in dry condition at easily accessable location as per direction of Engineer including toola, plants, labour etc complete in all respect, carrying the material from nearest approach with all leads & lifts, manpower & machinery,, material, labour etc complete as per detailed technical soecifications and as directed by Officer Commanding, minimum tensile strength 21kN as per IRC : 116, IS 16014 & MORTH specification of Roads & Bridge work, Section 2500.
CONST OF CC ROAD AND RAILING WORK NOVEL COLLEGE TO DULHA DEV KE AANGE TAK WARD 08
CONST OF CC ROAD AND RAILING WORK NOVEL COLLEGE TO DULHA DEV KE AANGE TAK WARD 08
P AND L OF HMP READY MIX BC 40 MM CONSOLIDATED INCL CLEANING OF ROAD SURFACE, APPLYING TACK COAT AND CORRECTION WORKS WITH DBM 50 MM INCL ROAD MARKING FOR RESURFACING WKS ON Z-K-L ROAD UNDER 55 RCC/ 762 BRTF PROJECT VIJAYAK IN LADAKH REGION
Providing and laying of Dense Bituminous Macadam of 50 mm consolidated thickness conforming to clause 505 of MoRT&H for road and bridge work (Fifth Revision) including cleaning of road surface as specified in Particular Specifications and as directed by Engineer-In-Charge/OC Contract.
Improvements to drain and other allied works at Kaggadasapura Road and Surrounding areas Ward No. 110-C.V.Raman Nagara CALL-2
Improvements to drain and other allied works at Kaggadasapura Road and Surrounding areas Ward No. 110-C.V.Raman Nagara
GENERAL Budget W o r k 2 0 1 7 2 0 1 8 Improvements toKaruvatta Thatta Mamoodu road working chainage from ch 0 00 3 578 Balance work in Karuvatta Thatta Mammoodu road General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>