Loading…
Loading…
10,594 results • Best match
Patch repairing and maintenance work at 3rd, 4th, 7th and 9th Km of Pachundi-Uddharanpur Road of Ramjibanpur Highway Sub-Division under Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2026-27.
Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). I By Mechanical Means, (i) With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)
Kolkata Basanti Road from 60.00 kmp to 68.00 kmp, Emergent repairing work in patches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Primer coat Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade (S.S-1 Packed Type) conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For WBM / WMM Surface: (with primer (SS-I) @ 0.85 kg/m2) (Mode of measurement: on the basis of finished surface area in sq.m).
Tharpahar road construction work under the fourth phase of Chief Minister Urban Infrastructure Development Scheme.
Tharpahar road construction work under the fourth phase of Chief Minister Urban Infrastructure Development Scheme.
Brahmani Bridge at 22.70 Km of Kaichor Nandigram Singhi Road, Repair and Rehabilitation work (Phase-1) under Katwa Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bardhaman during the year 2026-27.
Providing and laying Mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29 using approved coarse aggregate, fine aggregate, filler material and bitumen, prepared by using Mastic cooker including cost and carriage of all ingredients, cost of heating aggregates and binder, mixing in specified proportions conforming to approved Job Mix Formula and laid to required level and slope after cleaning the surface, compacting, sealing the construction joints and surface finishing conforming to specifications including providing antiskid surface with bitumen pre-coated fine-grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100°C, protruding 1 mm to 4 mm over mastic surface, including the hire charges of all tools and plants and machinery, pay of operators, cost of fuel and lubricants and all other incidental charges and quality control all complete as per Clause 516 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) 25 mm thickness
Construction work of CC road from Ward Bani Poore Ausan to Sumerganj link road.
Road and Drain Work
PCC work of M15 grade with 20mm and downgraded black granite (Crusher broken) stone chips including watering curing and cost of all labour T&P etc complete