Loading…
Loading…
10,427 results • Best match
DEPOSIT Elamkunnappuzha Panchayath Laying 75mm PVC Pipe at Mohanan Master road, 63 mm PVC Pipe at Mohanan Master Link road and 63 mm PVC Pipe at Murikkumpaadam Jetty road in Ward 18 Pipeline Work
16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30
RR work on NH 208 from km 36 to km 72 at various locations of existing road of Rangamati to Patichhari road section Pkg III at risk and cost of EPC Contractor in Tripura in FY 2026 27 on item rate and work order basis
Granular Sub-Base with well Graded Material(using Jhama brick aggregate) (Table: 400.1) A. By Mix in Place Method Construction of granular sub-base by providing well graded material(Jhama Brick aggregate, as per Table: 400.1,Grading-I),spreading in uniform layers with tractor with attachments or motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, applying and brooming sand to fill up the interstices of coarse aggregate, watering and compacting with smooth wheel roller to achieve the desired density, complete as per MoRT&H Technical specification clause 401.
From Kalageri Kere Road to Chaitanya Kalyan Mantapadavere under Ward No 01 of Dharwad Division Zonal Office No 03 and KHB Colony 6th Cross Road Rao Mane 7th Cross Road Pathan House, 8th Cross Road Kardi Mane Next Road Udaya Moraba House to ... Chikkamalligavada Road and ... sub roads Development ... Development work
From Kalageri Kere Road to Chaitanya Kalyan Mantapadavere under Ward No 01 of Dharwad Division Zonal Office No 03 and KHB Colony 6th Cross Road Rao Mane 7th Cross Road Pathan House, 8th Cross Road Kardi Mane Next Road Udaya Moraba House to Chikkamalligavada Road and Om Nagars main and sub roads Development work
LAC ADS 2025 2026 Providing drainage facility Kadapra Veeyapuram Road Ch1 500 to 1 650 Near Paattambalam temple drainage facility General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
Repairs and maintenance of bridges (sub structure), Road works including Platform surface, Circulating area, Level crossing etc. in the jurisdiction of Senior Section Engineer [Works]/Naihati [from Km 23/7 to 70/11] under Assistant Engineer/ Kanchrapara [Zone No. 01, period ending 30.06.2027].
A-Miscellaneous lump sum works covering all the chapters of the DSR [Ver-1]- Above/
Widening and strengthening work on Tapra - Padru - Bawatra Upto Distt. Border Road ( km 14/0 to 26/0)
Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using Fixed Form Paver and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately).