Loading…
Loading…
10,295 results • Best match
Protection/shifting of S&T cables/gears in connection with execution of ROB/RUB/Subway works in Miraj-Latur Road Section of Solapur division on Central Railway.
Horizontal boring of cable duct of minimum 2.0 Metre Mtr. depth along with laying of 120mm HDPE pipe for track crossing with minimum depth reckoned from the bottom of the rail/road crossing with minimum depth reckoned from ground level. The work shall be done as per extant practice & instructions of site Engineer. Preparation of site for Horizontal boring shall be carried out in presence of Railway Representative. HDPE will be supplied by Railways. Note: Contractor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable.
Patch Repair work of Different Other District Road Right and Left side of Bhognipur Jhinjhak Bisdhan Bilhaur Road (SH-114) in Km. 1 to 11 in Year 2026-27
Completion of Kesavapillappady Ponnam kani Road
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
LAC -ADS -Improvements to PunchakkariVandithadam road by providing BM and BC in Punchakkari Ward Nemom LACImprovements to Punchakkari -Vandithadam road by providing BM and BC in Punchakakri Ward Nemom LAC -General Civil Work
Road Work
GENERAL-SR-2025-26 Extension of Culvert and Providing Interlock Tile at Ch 1/000 RHS of carithas Ammanchery Road -GENERALGeneral Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>
Repairs to damaged station approach area including road connected to L.C Gates inside Railway premises with all other ancillary works under Sr. Divisional Engineer/1/Sealdah.