Loading…
Loading…
10,567 results • Best match
Annual Plan-Punalur Municipality 2026-27 Pro No 92/27-NEDUMKAYAM - CHALAKODE NEDUMKAYAM- TOC-H SCHOOL NEDUMKAYAM BIBBLE COLLEGE ROAD MAINTENANCE-General Civil Work
Road Maintenance
LAC-ADS-LAC ADS 2023-24 Sri Vijin M MLA-Kalliassery LAC-Kuruvat Valaam thottam Road in Ezhome Gramapnachayath-General Civil Work(Re-Tender)
3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
TERM CONTRACT FOR ARTIFICERS WORKS FOR OTM/MD ACCN UNDER AOR OF D and M BN / MAC GP / CT BN SOLAPUR HIGHWAY AT MIC and S UNDER GE(S) AHILYANAGAR
TERM CONTRACT FOR ARTIFICERS WORKS FOR OTM/MD ACCN UNDER AOR OF D&M BN / MAC GP / CT BN SOLAPUR HIGHWAY AT MIC&S UNDER GE(S) AHILYANAGAR
repairs
Providing Epoxy grouting to all the toilets of Nyayadegula building, curtain rods, providing andfixing of polycarbonate sheets and other essential works for Nyayadegula building, Siddiah road, Bengaluru
PLEASE REFER TO BOQ
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m,All kinds of soil 50% Ordinary rock@30% and Hard roak@20% as directed by Engineer-in-Charge.
Reconstruction and Improvement work from km 6 to km 11 Kamand Thouldhar motor road in the Thouldhar Block of district Tehri Garhwal, under the State sector (length 5.410 km).
Earth work in hill side cutting for construction of road in all type of soil & rock which may be met during execution of work as per approved plan L-section including disposal of all material 30 M. leads and 1.5 M lift as per direction by engineer I/C dressing of road surface after cutting work.removel & uprooting of trees & bushes also including all labour T&P etc.required for proper completion of the work.